Work out your LPDD electricity bill from the tariff set by JERC (J&K and Ladakh). Enter the units from your meter reading and see the bill built slab by slab. Got a bill already? Use the Ladakh bijli bill check to test each line.

  • Billed monthly
  • Order dated 18 August 2026
  • Rates checked 15 October 2026

Enter your units to see the bill.

Domestic rates

What a home on the Domestic metered tariff (DS-M) pays per unit after any subsidy built into the tariff.

Units per monthRate you pay
1–200₹2.35
201–400₹4.10
Above 400₹4.50

Fixed charge: ₹13 per kW per month on contracted load rounded up to the next 0.5 kW

Example bills

Units per monthBillAverage per unit
50₹143.50₹2.87
100₹261.00₹2.61
150₹378.50₹2.52
200₹496.00₹2.48
300₹906.00₹3.02
500₹1,766.00₹3.53

Sanctioned load 2 kW, urban, single phase. Duty and fuel surcharge excluded.

Where these rates come from

Regulator
JERC (J&K and Ladakh)
Order
JERC Tariff Order FY 2026-27 for LPDD (subsidised tariff)
Dated
18 August 2026
In force from
1 September 2026
Distributors
Ladakh Power Development Department (LPDD)
Billing
Monthly
Document
Open the tariff order (PDF)

Not in this estimate

  • Subsidised tariff (UT grant-in-aid).
  • Electricity duty and FPPCA not included.

All LT tariff categories in Ladakh

Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.

DS-BPLDomestic BPL (up to 30 units/month)Verified
UnitsRate
1–30₹1.50 /kWh

Fixed charge: ₹5 per kW per month

Units above 30 billed at metered domestic slab rates.

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-1, printed p.192. Open the order

DS-MDomestic meteredVerified

Homes, religious institutions, group housing, orphanages, charitable institutions; professionals using up to 20% of built-up area

UnitsRate
1–200₹2.35 /kWh
201–400₹4.10 /kWh
Above 400₹4.50 /kWh

Slabs are telescopic: each band of units is charged at its own rate.

Unmetered, up to 2 kW

Rs 377 per 1/4 kW per month

Unmetered, above 2 kW

Rs 3,016 + Rs 863 per extra 1/4 kW per month

Fixed charge: ₹13 per kW per month on contracted load rounded up to the next 0.5 kW

Subsidised tariff (Govt of Ladakh grant-in-aid Rs 22.37 Cr) from 1 Sep 2026. Full-cost tariff, shown for information: 4.10 / 6.10 / 7.60 with Rs 13/kW. Order's own example: 600 units, 3 kW = Rs 2,190 energy + Rs 39 fixed = Rs 2,229 (excl. duty). ToD applicable (peak 06-08 & 18-22 h; solar 09-17 h at 0.8x) for loads of 10 kW and above.

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-1 and illustration, printed p.192-193; 8.15-8.16 p.173-176. Open the order

NDS-ANon-domestic / commercial (other than hotels etc.) - single phaseVerified
UnitsRate
1–200₹3.75 /kWh
201–500₹5.60 /kWh
Above 500₹6.10 /kWh

Slabs are telescopic: each band of units is charged at its own rate.

Fixed charge: ₹66 per kW per month on contracted load rounded up to the next 0.5 kW

Three-phase: 6.10/kVAh on all units with Rs 159/kVA of billing demand. Unmetered: Rs 1,079 per 1/4 kW up to 1 kW.

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-2, printed p.194-195. Open the order

NDS-BHotels, guest houses, resorts, homestays (registered with Tourism Dept)Verified
UnitsRate
All units₹4.30 /kWh

Fixed charge: ₹66 per kW per month on contracted load rounded up to the next 0.5 kW

Three-phase: 4.50/kVAh with Rs 159/kVA. New lower sub-category after the UT declared registered tourism units 'industry' (May 2026).

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-3, printed p.196. Open the order

GOVTState / Central Govt departments (incl. defence, educational institutions)Verified
UnitsRate
All units₹8.95 /kVAh

Fixed charge: ₹58 per kVA of billing demand per month

LT supply rate; 11 kV 8.85, 33 kV 8.75.

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-4, printed p.197. Open the order

AGRAgriculture (metered)Verified
UnitsRate
All units₹1.00 /kWh

Fixed charge: ₹40 per HP per month (rounded up to 0.5 HP)

Rate by connected load: 0-10 HP 1.00; 11-20 HP 1.50; above 20 HP 5.50. Unmetered: Rs 375 / 413 / 2,250 per HP per month.

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-5, printed p.197-198. Open the order

PSLPublic street lighting (metered)Verified
UnitsRate
All units₹8.95 /kWh

Fixed charge: ₹84 per kW per month (rounded up to whole kW)

Unmetered: Rs 5,250 per kW per month.

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-6, printed p.198. Open the order

PWW-LTPublic water works - LTVerified
UnitsRate
All units₹9.15 /kWh

Fixed charge: ₹84 per kW per month (rounded up to whole kW)

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-7, printed p.199. Open the order

LTISLT industrialVerified
UnitsRate
All units₹4.30 /kVAh

Fixed charge: ₹71 per kVA of billing demand per month

5% rebate if supplied and metered on HT below 100 kW.

Source: JERC (J&K and Ladakh) Tariff Order for LPDD: True-up FY 2024-25, APR FY 2025-26, Business Plan FY 2026-27 to 2028-29 and ARR & Tariff FY 2026-27 (Order 05 of 2026, 18-08-2026), Chapter 11 Tariff Schedule (subsidised), Table 11-9, printed p.200. Open the order

S9-EVEV charging stations - LT (Schedule 9)Verified

11.24. This tariff category is applicable to electric vehicle charging stations including battery swapping stations for electric vehicles.

UnitsRate
All units₹7.50 /kVAh

Fixed charge: None

Source: JERC (J&K and Ladakh) Tariff Order FY 2026-27 for LPDD, Order 05 of 2026 (18-08-2026), Schedule 9, Table 11-13, printed p.203. Open the order

Ladakh bill questions

How much is the electricity bill for 100 units in Ladakh?

About ₹261.00 for 100 units in a month, using the current JERC (J&K and Ladakh) tariff. Sanctioned load 2 kW, urban, single phase. Electricity duty and the monthly fuel surcharge are not included.

What will 200 or 300 units cost in Ladakh?

Roughly ₹496.00 for 200 units, and ₹906.00 for 300 units. Use the calculator above for your exact units and load.

Are Ladakh domestic slabs telescopic?

Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.

How often are Ladakh electricity bills issued?

Homes are billed monthly. Enter the units for one billing period.

Which tariff order are these Ladakh rates from?

JERC Tariff Order FY 2026-27 for LPDD (subsidised tariff), dated 18 August 2026, in force from 1 September 2026. A link to the PDF is in the sources box on this page.

What does this estimate leave out?

Subsidised tariff (UT grant-in-aid). Electricity duty and FPPCA not included.

Where is the consumer number on my Ladakh electricity bill?

The name differs by discom. LPDD: Consumer ID (10 digits). The table on this page shows where each discom prints it, when its official pages say so.

Where to find your consumer number

Your bill shows a number that identifies your connection. In Ladakh the discom calls it:

DiscomName on the billDigitsWhere to find itSource
LPDDConsumer ID10At the top left, on the first line, above your name.LPDD bill (sample bill, February 2025)

From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.