ebbillcalc

JKPDD bill calculator: Jammu and Kashmir electricity bill

Work out your JPDCL, KPDCL electricity bill from the tariff set by JERC (J&K and Ladakh). Enter the units from your meter reading and see the bill built slab by slab. JKPDD is the Power Development Department. JPDCL (Jammu) and KPDCL (Kashmir) now supply and bill homes. Got a bill already? Use the Jammu & Kashmir bijli bill check to test each line.

  • Billed monthly
  • Order dated 20 August 2026
  • Rates checked 15 October 2026

Enter your units to see the bill.

Domestic rates

What a home on the Domestic - metered tariff (S1-DOM) pays per unit after any subsidy built into the tariff.

Units per monthRate you pay
1–200₹2.45
201–400₹4.20
Above 400₹4.60

Fixed charge: ₹10 per kW per month; load rounded up to the next 0.5 kW

Example bills

Units per monthBillAverage per unit
50₹142.50₹2.85
100₹265.00₹2.65
150₹387.50₹2.58
200₹510.00₹2.55
300₹930.00₹3.10
500₹1,810.00₹3.62

Sanctioned load 2 kW, urban, single phase. Duty and fuel surcharge excluded.

Where these rates come from

Regulator
JERC (J&K and Ladakh)
Order
JERC Retail Supply Tariff Order FY 2026-27 for JPDCL & KPDCL (subsidised tariff)
Dated
20 August 2026
In force from
1 September 2026
Distributors
JPDCL (Jammu); KPDCL (Kashmir)
Billing
Monthly
Document
Open the tariff order (PDF)

Not in this estimate

  • JERC subsidised tariff from 1 Sep 2026.
  • Electricity duty not included. Prepaid smart meters get 2% off energy.

All LT tariff categories in Jammu & Kashmir

Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.

S1-BPLDomestic - BPL (up to 30 units/month)Verified

BPL certificate holders

UnitsRate
1–30₹1.40 /kWh

Fixed charge: ₹5 per kW per month

Units above 30 are billed at the metered domestic slab rates.

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, Table 10-1 printed p.280. Open the order

S1-DOMDomestic - meteredVerified

Homes, religious and charitable institutions, group housing, professionals' residences

UnitsRate
1–200₹2.45 /kWh
201–400₹4.20 /kWh
Above 400₹4.60 /kWh

Slabs are telescopic: each band of units is charged at its own rate.

Fixed charge: ₹10 per kW per month; load rounded up to the next 0.5 kW

Subsidised tariff (UT Government grant Rs 2,420.78 Cr). Unmetered flat rate: Rs 284 per 1/4 kW up to 2 kW; above 2 kW Rs 2,272 + Rs 568 per extra 1/4 kW. ToD for sanctioned load above 10 kW (except agriculture): peak 06-09 & 17-22 h +10% (+20% for industry and commercial), solar 09-17 h -20% (11.24).

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, Table 10-1 printed p.280-281. Open the order

S2-1PHNon-domestic / commercial - single phaseVerified
UnitsRate
1–200₹3.75 /kWh
Above 200₹5.70 /kWh

Slabs are telescopic: each band of units is charged at its own rate.

Fixed charge: ₹75 per kW per month; load rounded up to 0.5 kW

Unmetered: Rs 813 per 1/4 kW up to 1 kW; then Rs 3,252 + Rs 813 per extra 1/4 kW.

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, Table 10-2 printed p.283-284. Open the order

S2-3PHNon-domestic / commercial - three phase (up to 100 kW)Verified
UnitsRate
All units₹6.15 /kVAh

Fixed charge: ₹140 per kVA per month on billing demand

HT-metered below 100 kW: 5% energy rebate. ToD for sanctioned load above 10 kW (except agriculture): peak 06-09 & 17-22 h +10% (+20% for industry and commercial), solar 09-17 h -20% (11.24).

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, Table 10-2 printed p.283. Open the order

S3-LTGovernment departments (incl. public street lighting, water works) - LTVerified
UnitsRate
All units₹8.30 /kVAh

Fixed charge: ₹42 per kVA per month on billing demand (HT: 110)

Unmetered public street lighting: Rs 5,005 per kW per month. 11 kV / 33 kV: energy lower by 10 / 20 paise.

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, Table 10-3 printed p.285. Open the order

S4-AGAgriculture (metered)Verified

0 to 20 HP

UnitsRate
All units₹1.05 /kWh

₹23 Rs/HP per month

Above 20 HP

UnitsRate
All units₹6.30 /kWh

₹47 Rs/HP per month

Unmetered

Rs 375/HP/month up to 20 HP; Rs 2,048/HP/month above 20 HP

Fixed charge: see tables

No ToD.

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, Table 10-4 printed p.287. Open the order

S5-LTISLT industrial supply (up to 100 kW / 110 kVA)Verified

Units registered with Industries & Commerce Dept; atta chakkis, rice huskers, oil expellers in rural areas

UnitsRate
All units₹4.60 /kVAh

Fixed charge: ₹63 per kVA per month on billing demand

HT-metered below 100 kW: 5% energy rebate. ToD for sanctioned load above 10 kW (except agriculture): peak 06-09 & 17-22 h +10% (+20% for industry and commercial), solar 09-17 h -20% (11.24).

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, Table 10-5 printed p.288. Open the order

S9-EVEV charging / battery swapping stations - LTVerified
UnitsRate
All units₹7.00 /kVAh

Fixed charge: None

ToD for sanctioned load above 10 kW (except agriculture): peak 06-09 & 17-22 h +10% (+20% for industry and commercial), solar 09-17 h -20% (11.24).

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, Table 10-9 printed p.294. Open the order

S11-TEMPTemporary connections (LT and HT)Verified

Fixed charge: 1.5 x the applicable fixed/demand and energy charges

Up to 12 months at a time.

Source: JERC (J&K and Ladakh) Order: APR FY 2025-26, ARR & Retail Supply Tariff FY 2026-27 and MYT FY 2026-29 for JPDCL & KPDCL (Jammu, 20-08-2026), Ch.10 Tariff Schedule (Subsidized tariff) and Ch.11 Terms & Conditions, 10.25 printed p.296. Open the order

Jammu & Kashmir bill questions

How much is the electricity bill for 100 units in Jammu & Kashmir?

About ₹265.00 for 100 units in a month, using the current JERC (J&K and Ladakh) tariff. Sanctioned load 2 kW, urban, single phase. Electricity duty and the monthly fuel surcharge are not included.

What will 200 or 300 units cost in Jammu & Kashmir?

Roughly ₹510.00 for 200 units, and ₹930.00 for 300 units. Use the calculator above for your exact units and load.

Are Jammu & Kashmir domestic slabs telescopic?

Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.

How often are Jammu & Kashmir electricity bills issued?

Homes are billed monthly. Enter the units for one billing period.

Which tariff order are these Jammu & Kashmir rates from?

JERC Retail Supply Tariff Order FY 2026-27 for JPDCL & KPDCL (subsidised tariff), dated 20 August 2026, in force from 1 September 2026. A link to the PDF is in the sources box on this page.

What does this estimate leave out?

JERC subsidised tariff from 1 Sep 2026. Electricity duty not included. Prepaid smart meters get 2% off energy.

Is JKPDD the same as JPDCL and KPDCL?

JKPDD is the Power Development Department. JPDCL (Jammu) and KPDCL (Kashmir) now supply and bill homes.

Where is the consumer number on my Jammu & Kashmir electricity bill?

The name differs by discom. KPDCL: CONSUMER ID (13 digits). The table on this page shows where each discom prints it, when its official pages say so.

Where to find your consumer number

Your bill shows a number that identifies your connection. In Jammu & Kashmir the discom calls it:

DiscomName on the billDigitsWhere to find itSource
KPDCLCONSUMER ID13On the left, below Division and Subdivision, just above your name.KPDCL bill (sample bill, November 2024)

From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.