ebbillcalc

Gujarat light bill calculator: DGVCL, MGVCL, PGVCL and UGVCL

Work out your DGVCL, MGVCL, PGVCL, UGVCL electricity bill from the tariff set by GERC. Enter the units from your meter reading and see the bill built slab by slab. All four GUVNL discoms use the same GERC tariff. Torrent Power homes in Ahmedabad and Surat have their own calculator.

  • Billed monthly
  • Order dated 25 March 2026
  • Rates checked 15 October 2026

Enter your units to see the bill.

Domestic rates

What a home on the Rate: RGP (Residential General Purpose) tariff (RGP) pays per unit after any subsidy built into the tariff.

Units per monthRate you pay
1–50₹3.05
51–100₹3.50
101–250₹4.15
Above 250₹5.20

Fixed charge: per connection per month, slab by connected load All units: ₹15; All units: ₹25; All units: ₹45; All units: ₹70

Example bills

Units per monthBillAverage per unit
50₹301.57₹6.03
100₹610.94₹6.11
150₹954.11₹6.36
200₹1,297.28₹6.49
300₹2,038.20₹6.79
500₹3,629.25₹7.26

Sanctioned load 2 kW, urban, single phase. Duty and fuel surcharge excluded.

Where these rates come from

Regulator
GERC
Order
Truing up for FY 2024-25 and Determination of Revised ARR and Tariff for FY 2026-27 (separate orders for DGVCL, MGVCL, PGVCL, UGVCL with common Tariff Schedule)
Dated
25 March 2026
In force from
1 April 2026
Distributors
DGVCL (Dakshin Gujarat Vij Company Ltd); MGVCL (Madhya Gujarat Vij Company Ltd); PGVCL (Paschim Gujarat Vij Company Ltd); UGVCL (Uttar Gujarat Vij Company Ltd)
Billing
Monthly
Document
Open the tariff order (PDF)

Not in this estimate

  • FPPAS rate is GUVNL's from 1 July 2026; it changes quarterly.
  • Electricity duty (15% urban / 7.5% rural per the Duty Act text, not yet confirmed) not included.

All LT tariff categories in Gujarat

Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.

RGPRate: RGP (Residential General Purpose)Verified

Residential premises not covered under RGP (Rural); single-phase up to 6 kW, three-phase above 6 kW; also small-scale animal husbandry up to 10 kW CD / max 30 milking animals.

UnitsRate
1–50₹3.05 /kWh
51–100₹3.50 /kWh
101–250₹4.15 /kWh
Above 250₹5.20 /kWh

Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on per month, units (total monthly consumption).

Fixed charge: per connection per month, slab by connected load All units: ₹15; All units: ₹25; All units: ₹45; All units: ₹70

Slabs labelled 'First 50 / Next 50 / Next 150 / Above 250 units' of total monthly consumption -> telescopic reading inferred from wording; schedule does not use the word 'telescopic'. Pre-paid rates apply only while positive balance maintained (Gen. cond. 17). Rates unchanged vs FY 2025-26 for post-paid; pre-paid rates reduced (FY25-26 pre-paid were 299/343/407/510 paise). Smart-meter consumers get 60 paise/unit off for consumption 11:00-17:00. Pre-paid smart meters: energy charge 3% lower.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 1 (Rate: RGP), clauses 1.1-1.5. Open the order

RGP-BPLRate: RGP - BPL householdVerified

BPL households holding card from the competent authority (urban RGP).

UnitsRate
1–50₹1.50 /kWh
Above 50—

Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on per month, units.

Fixed charge: ₹5 per connection per month

'The concessional tariff is only for 50 units per month.' Exactly how remaining units map onto RGP slabs (whether units 51-100 take RGP 'next 50' rate) is not spelled out; most natural reading is RGP slab rates for units beyond 50.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 1.1 (BPL fixed charge) and 1.3. Open the order

RGP(RURAL)Rate: RGP (Rural)Verified

Residential premises located in areas within Gram Panchayat limits.

UnitsRate
1–50₹2.65 /kWh
51–100₹3.10 /kWh
101–250₹3.75 /kWh
Above 250₹4.90 /kWh

Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on per month, units (total monthly consumption).

Fixed charge: per connection per month, slab by connected load All units: ₹15; All units: ₹25; All units: ₹45; All units: ₹70

Fixed charges same as RGP. If part of residential premises is used for commercial purposes, entire consumption charged under this tariff. FY25-26 pre-paid were 260/304/368/480. Smart-meter consumers get 60 paise/unit off 11:00-17:00. Pre-paid smart meters: energy charge 3% lower.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 2 (Rate: RGP (Rural)), clauses 2.1-2.5. Open the order

RGP(RURAL)-BPLRate: RGP (Rural) - BPL householdVerified

BPL households in Gram Panchayat areas.

UnitsRate
1–50₹1.50 /kWh
Above 50—

Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on per month, units.

Fixed charge: ₹5 per connection per month

Concession limited to 50 units/month.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 2.1 and 2.3. Open the order

GLPRate: GLP (General Lighting Purpose)Verified

Registered charitable/educational institutions, R&D laboratories, and street lights.

UnitsRate
All units₹3.90 /kWh

Slabs counted on per month, units.

Fixed charge: ₹70 per installation per month

Street lighting is billed under GLP (no separate SL category). For street lights the licensee maintains conductor on pole; consumer maintains lamps, fixtures, wiring. Smart-meter consumers get 60 paise/unit off 11:00-17:00. Pre-paid smart meters: energy charge 3% lower.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 3 (Rate: GLP). Open the order

NON-RGPRate: Non-RGPVerified

Non-residential premises not covered by any other tariff category, aggregate connected load up to 40 kW.

contracted load <= 10 kW

UnitsRate
All units₹4.35 /kWh
UnitsRate
All units₹4.22 /kWh

contracted load > 10 kW

UnitsRate
All units₹4.65 /kWh
UnitsRate
All units₹4.51 /kWh

Fixed charge: per kW of connected load per month, telescopic All units: ₹; All units: ₹

Fixed charge uses connected load; energy-rate threshold uses contracted load. Non-RGP consumers may opt for LTMD. ToU +45 paise 07-11 & 18-22 (above 10 kW); 60 paise off 11-17 with smart/ToD meter. Pre-paid smart meters: energy charge 3% lower.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 4 (Rate: Non-RGP), 4.1-4.5. Open the order

LTMDRate: LTMD (Low Tension Maximum Demand)Verified

Premises not covered elsewhere with aggregate load above 40 kW (and Non-RGP consumers opting for it).

UnitsRate
All units₹4.60 /kWh

Slabs counted on per month, units.

Fixed charge: demand charge per kW of billing demand per month, telescopic All units: ₹; All units: ₹; All units: ₹; All units: ₹

ToU +45 paise 07-11 & 18-22; 60 paise off 11-17 with ToD meter. Pre-paid smart meters: energy charge 3% lower.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 5 (Rate: LTMD), 5.1-5.8. Open the order

LTP-LIRate: LTP - Lift IrrigationVerified

LT agricultural lift-irrigation consumers up to 180 HP lifting water from surface sources (canal, river, dam), continuous supply.

UnitsRate
All units₹0.80 /kWh

Slabs counted on per month, units.

Fixed charge: ₹20 per HP per month

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 6 (Rate: LTP - Lift Irrigation). Open the order

WWSP-IRate: WWSP - Type IVerified

Water works and sewerage pumping operated by bodies other than local authorities.

UnitsRate
All units₹4.30 /kWh

Slabs counted on per month, units.

Fixed charge: ₹25 per HP per month

40 paise/unit off 11:00-18:00 with ToD meter. Pre-paid smart meters: energy charge 3% lower.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 7.1. Open the order

WWSP-IIRate: WWSP - Type IIVerified

Water works operated by local authorities (Municipal Corporation, GWSSB etc.) located outside Gram Panchayat areas.

UnitsRate
All units₹4.10 /kWh

Slabs counted on per month, units.

Fixed charge: ₹20 per HP per month

Local authorities outside Gram Panchayat areas. 40 paise/unit off 11:00-18:00 with ToD meter. Pre-paid smart meters: energy charge 3% lower.

Source: GERC Tariff Order for DGVCL, Case 2581/2025 dt 25-03-2026, Tariff Schedule (as published by DGVCL), Tariff Schedule para 7.2, order p.164 (read visually). Open the order

WWSP-IIIRate: WWSP - Type IIIVerified

Water works operated by Municipalities/Nagarpalikas/Gram Panchayats/GWSSB for installations within Gram Panchayat areas.

UnitsRate
All units₹3.20 /kWh

Slabs counted on per month, units.

Fixed charge: no fixed charge in schedule

Attribution of 320/310 to Type III consistent across two reads of FY26-27 schedule, but a read of FY25-26 schedule had the layout garbled; confirm visually. 40 paise/unit off 11:00-18:00 with ToD meter. Pre-paid smart meters: energy charge 3% lower.

Source: GERC Tariff Order for DGVCL, Case 2581/2025 dt 25-03-2026, Tariff Schedule (as published by DGVCL), Tariff Schedule para 7.3, order p.164 (read visually). Open the order

AG-HPRate: AG - HP based tariff (unmetered)Verified

Agricultural irrigation pumps (excluding LTP lift irrigation), opting for HP-based tariff.

Fixed charge: ₹200 per HP per month on entire contracted load

Only irrigation pumping plus one bulb/CFL up to 40 W permitted (8.2). Brick-kiln water supply: additional Rs 100/HP/year, min Rs 2000/year per brick unit (8.3-8.4). FPPPA for AG is not recovered from consumers directly; compensated to DISCOMs by State Govt (per DISCOM submission in tariff order).

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 8.1.1. Open the order

AG-METEREDRate: AG - Metered tariffVerified

Agricultural irrigation pumps (excluding LTP lift irrigation) on metered tariff.

UnitsRate
All units₹0.60 /kWh

Slabs counted on per month, units.

Fixed charge: ₹20 per HP per month

See AG-HP notes (8.2-8.4).

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 8.1.2. Open the order

AG-TATKALRate: AG - Tatkal schemeVerified

Agricultural connections released under Tatkal scheme (for 5 years from start of supply, then normal metered tariff).

UnitsRate
All units₹0.80 /kWh

Slabs counted on per month, units.

Fixed charge: ₹20 per HP per month

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 8.1.3. Open the order

TMPRate: TMP (Temporary supply at low voltage)Verified

Temporary LT supply where no regular supply agreement exists.

UnitsRate
All units₹4.65 /kWh

Slabs counted on per unit.

Fixed charge: ₹15 per kW per day per installation

Bill payable within 7 days; disconnection on 24 hours' notice. No pre-paid rate.

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 9 (Rate: TMP). Open the order

LT-EVRate: LT Electric Vehicle (EV) Charging StationsVerified

This tariff is applicable to consumers who use electricity exclusively for Electric Vehicle Charging installations.

UnitsRate
All units₹4.10 /kWh

Slabs counted on per month, units.

Fixed charge: ₹25 per installation per month

ToU +45 paise 07-11 & 18-22 (above 10 kW); 60 paise off 11-17. Pre-paid smart meters: energy charge 3% lower. The 60-paise discount 11-17 h needs a smart meter (up to 10 kW) or a ToD/smart meter (above 10 kW).

Source: GERC Annexure: Tariff Schedule of DGVCL, MGVCL, PGVCL, UGVCL w.e.f. 01.04.2026 (March 2026), Part I, Section 10. Open the order

Gujarat bill questions

How much is the electricity bill for 100 units in Gujarat?

About ₹610.94 for 100 units in a month, using the current GERC tariff. Sanctioned load 2 kW, urban, single phase. Electricity duty and the monthly fuel surcharge are not included.

What will 200 or 300 units cost in Gujarat?

Roughly ₹1,297.28 for 200 units, and ₹2,038.20 for 300 units. Use the calculator above for your exact units and load.

Are Gujarat domestic slabs telescopic?

Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.

How often are Gujarat electricity bills issued?

Homes are billed monthly. Enter the units for one billing period.

Which tariff order are these Gujarat rates from?

Truing up for FY 2024-25 and Determination of Revised ARR and Tariff for FY 2026-27 (separate orders for DGVCL, MGVCL, PGVCL, UGVCL with common Tariff Schedule), dated 25 March 2026, in force from 1 April 2026. A link to the PDF is in the sources box on this page.

What does this estimate leave out?

FPPAS rate is GUVNL's from 1 July 2026; it changes quarterly. Electricity duty (15% urban / 7.5% rural per the Duty Act text, not yet confirmed) not included.

Where is the consumer number on my Gujarat electricity bill?

The name differs by discom. UGVCL: Consumer No. (11 digits); DGVCL: Customer No. (11 digits); PGVCL: Customer No. (11 digits); MGVCL: Customer No. (11 digits); Torrent Power Ahmedabad: Customer ID (6 digits). The table on this page shows where each discom prints it, when its official pages say so.

Where to find your consumer number

Your bill shows a number that identifies your connection. In Gujarat the discoms call it:

DiscomName on the billDigitsWhere to find itSource
UGVCLConsumer No.11In the block on the left with your name and district, just above the meter number.UGVCL e-bill (sample bill, October–November 2024)
DGVCLCustomer No.11Below your name and address, at the start of the bill details table, next to the meter number.DGVCL e-bill (sample bill, February–March 2023)
PGVCLCustomer No.11Below your name and address, at the start of the bill details table, next to the meter number.PGVCL e-bill (sample bill, May 2023)
MGVCLCustomer No.11Below your name and address, at the start of the bill details table, next to the meter number.MGVCL FAQ
Torrent Power AhmedabadCustomer ID6On the right, below LT, in large print.Torrent Power e-bill, Ahmedabad (sample bill, May 2026)

From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.