Rajasthan bijli bill calculator: JVVNL, AVVNL and JdVVNL
Work out your JVVNL, AVVNL, JdVVNL electricity bill from the tariff set by RERC. Enter the units from your meter reading and see the bill built slab by slab. All three discoms use the same RERC tariff. Got a bill already? Use the Rajasthan bijli bill check to test each line.
- Billed monthly
- Order dated 30 March 2026
- Rates checked 15 October 2026
Enter your units to see the bill.
Domestic rates
What a home on the Domestic Service - General Domestic tariff (DS/LT-1 (General Domestic 1-4)) pays per unit after any subsidy built into the tariff.
| Units per month | Rate you pay |
|---|---|
| 1–50 | ₹4.75 |
| 51–150 | ₹6.00 |
| 151–500 | ₹7.00 |
| Above 500 | ₹7.50 |
Fixed charge: per connection per month, by sub-category
Example bills
| Units per month | Bill | Average per unit |
|---|---|---|
| 50 | ₹0.00 | ₹0.00 |
| 100 | ₹0.00 | ₹0.00 |
| 150 | ₹450.00 | ₹3.00 |
| 200 | ₹850.00 | ₹4.25 |
| 300 | ₹2,115.00 | ₹7.05 |
| 500 | ₹4,025.00 | ₹8.05 |
Urban, single phase. With Mukhyamantri Nishulk Bijli Yojana applied (on by default; see Government schemes below). Duty and fuel surcharge excluded.
Where these rates come from
- Regulator
- RERC
- Order
- True up 2024-25, ARR, Tariff and Investment Plan 2026-27 of Discoms (JVVNL, AVVNL, JdVVNL)
- Dated
- 30 March 2026
- In force from
- 1 April 2026
- Distributors
- Jaipur Vidyut Vitran Nigam Ltd (JVVNL); Ajmer Vidyut Vitran Nigam Ltd (AVVNL); Jodhpur Vidyut Vitran Nigam Ltd (JdVVNL)
- Billing
- Monthly
- Document
- Open the tariff order (PDF)
Not in this estimate
- Fixed-charge band (GD-1 to GD-4) uses this month's units; discoms may assign the band from past consumption.
- No water conservation cess on domestic use (Duty Act s.3B). Urban cess only in municipal areas, and not up to 100 units a month (s.3C).
- The duty rate comes from a State investment-portal table, not the notification.
Government schemes in Rajasthan
Schemes that change what a home pays, read from the government order, the regulator’s order or the discom’s own notice. Checked 15 October 2026.
Mukhyamantri Nishulk Bijli Yojana In the calculator, on by default
Domestic consumers using up to 100 units a month get a zero bill. From 101 to 200 units, the energy charge of the first 100 units, the fixed charge, the urban cess and the electricity duty are waived. Above 200 units only the energy charge of the first 100 units is free.
- The regulatory surcharge and water cess are not named, so we treat them as payable except in a zero bill.
- Registration is required: RERC’s FY 2026-27 order and the Bijli Mitra portal refer to registered consumers. The Jan Aadhaar link and the March 2024 cut-off come only from news reports. The Energy Department order was not found.
- No FY 2026-27 document restates the rule. RERC’s FY 2026-27 order (para 4.11) mentions the scheme’s beneficiary families, so it appears to continue.
Source: Government of Rajasthan, Economic Review 2023-24, Ch. 5 (Mukhyamantri Nishulk Bijli Yojana) Rajasthan Budget Speech 2023-24, para 4 (III) RERC Tariff Order FY 2026-27, 30-03-2026, para 4.11 and p. 241 (Tariff Orders list)
150 free units with rooftop solar Not applied
Announced in the 2025-26 budget; no order with the rules has been published, so it is not applied.
All LT tariff categories in Rajasthan
Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.
DS/LT-1 (BPL / Astha Card / Silicosis / Small Domestic)Domestic Service - BPL, Astha Card holders, Silicosis patients / Small DomesticVerified
Individual (not institutional) BPL/Astha card holders/Silicosis patients and small domestic consumers whose average consumption is up to 50 units/month
| Units | Rate |
|---|---|
| 1–50 | ₹4.75 /kWh |
Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on per month, units.
Fixed charge: ₹150 per connection per month
Units above 50 in any billing cycle are charged at the applicable General Domestic slab rates for the respective slabs. 10% rebate on energy charges for rural domestic connections (not where more than block-hours supply). Prepaid meter rebate 15 paise/unit. Solar water heater rebate 25 paise/unit capped Rs 300/month for up to 5 years.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
DS/LT-1 (General Domestic 1-4)Domestic Service - General DomesticVerified
Residential consumers for bona fide domestic use (also certain religious/charitable premises, mid-day meal kitchens etc. per schedule); LT up to 50 kVA
| Units | Rate |
|---|---|
| 1–50 | ₹4.75 /kWh |
| 51–150 | ₹6.00 /kWh |
| 151–500 | ₹7.00 /kWh |
| Above 500 | ₹7.50 /kWh |
Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on per month, units; energy slabs telescopic; fixed charge sub-category (GD-1..4) determined by previous FY average monthly consumption.
Fixed charge: per connection per month, by sub-category
Rural 10% energy-charge rebate (not where more than block-hours supply); prepaid rebate 15 p/unit; solar water heater rebate 25 p/unit (cap Rs 300/month, 5 yrs); community kitchens: 50% of energy charges with full fixed charges. Prompt payment rebate 0.15% (7 days before due date) / 0.35% (10 days). DPS 2% monthly-billed, 4% bi-monthly-billed. Household rates unchanged from FY 2025-26 (Annexure C shows existing = approved).
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
NDS/LT-2 (up to 5 kW)Non-Domestic Service - sanctioned connected load up to 5 kWVerified
Shops, business houses, hotels, petrol pumps, cinemas, private educational institutions, private hospitals/clinics and all categories not covered by other LT schedules
| Units | Rate |
|---|---|
| 1–100 | ₹7.00 /kWh |
| Above 100 | ₹8.50 /kWh |
Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on per month, units; fixed charge type by previous FY average monthly consumption.
Fixed charge: per connection per month, by type
Prepaid rebate 15 p/unit.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
NDS/LT-2 (above 5 kW)Non-Domestic Service - SCL above 5 kW, max demand up to 50 kVAVerified
Non-domestic LT consumers above 5 kW SCL up to 50 kVA max demand
| Units | Rate |
|---|---|
| 1–100 | ₹7.00 /kWh |
| Above 100 | ₹8.50 /kWh |
Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on per month, units.
Fixed charge: per kW of SCL per month (or per kVA billing demand)
Demand above 50 kVA must shift to HT.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
PSL/LT-3Public Street Lighting ServiceVerified
Street lighting and traffic signals of Government/local bodies (municipalities, panchayats, industrial areas); separately metered NH lighting; excludes private colonies
| Units | Rate |
|---|---|
| All units | ₹7.00 /kWh |
Slabs counted on per month, units.
population < 1 lakh
| Units | Rate |
|---|---|
| All units | ₹7.00 /kWh |
population >= 1 lakh
| Units | Rate |
|---|---|
| All units | ₹7.50 /kWh |
Fixed charge: per lamp point per month
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
AG/MS/LT-4Agriculture - Metered SupplyVerified
Agricultural pumping (incl. govt nurseries) with metered supply
| Units | Rate |
|---|---|
| All units | ₹5.25 /kWh |
Slabs counted on per month, units.
General - supply in block hours
| Units | Rate |
|---|---|
| All units | ₹5.25 /kWh |
All others - supply more than block hours
| Units | Rate |
|---|---|
| All units | ₹7.00 /kWh |
Fixed charge: per HP of SCL per month
Tariff rates shown are RERC tariffs; Rajasthan Government subsidises agriculture heavily (Mukhyamantri Kisan Mitra Urja Yojana etc.) - not researched here.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
AG/FR/LT-4Agriculture - Flat Rate (Unmetered) SupplyVerified
Unmetered agricultural pumping connections
| Units | Rate |
|---|---|
| All units | ₹745.00 /HP/month |
Slabs counted on per HP of SCL per month.
General - supply in block hours
| Units | Rate |
|---|---|
| All units | ₹745.00 /HP/month |
All others - more than block hours supply
| Units | Rate |
|---|---|
| All units | ₹895.00 /HP/month |
Fixed charge: per HP of SCL per month
Code printed as AG/FR/LT-4 in 2026 document, AG/FRU/LT-4 in JdVVNL 2025.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
SP/LT-5Small Industrial ServiceVerified
Small industrial consumers, printing presses, govt lift irrigation projects etc. with aggregate connected load not exceeding 18.65 kW (25 HP) incl. admissible lighting load
| Units | Rate |
|---|---|
| All units | ₹6.00 /kWh |
Slabs counted on per month, units.
Fixed charge: per HP of SCL per month
Code printed SP/LT-5 in 2026 document; SI/LT-5 in JdVVNL 2025.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
MP/LT-6Medium Industrial ServiceVerified
Industrial consumers with SCL above 18.65 kW (25 HP) up to 112 kW (150 HP) and/or contract/max demand of 50 kVA
| Units | Rate |
|---|---|
| All units | ₹6.50 /kWh |
Slabs counted on per month, units.
Fixed charge: per HP of SCL per month OR per kVA of billing demand per month
RERC FY 2026-27: Rs 6.50/unit. The Rs 6.00 figure seen in news is the minimum energy charge for HT-3 after rebates, not the LT-6 rate.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
ML/LT-7Bulk Supply for Mixed LoadVerified
Unregistered orphanages/leper homes, govt/agency educational institutions (except govt schools), railways, polyhouses, public parks, cantonments/defence, aerodromes, govt/Red Cross hospitals etc. for mixed load up to 50 kVA
| Units | Rate |
|---|---|
| All units | ₹7.50 /kWh |
Slabs counted on per month, units.
Fixed charge: per HP of SCL per month OR per kVA billing demand per month
Separately metered loads billed under own category; if one load type is >= 75% of remaining load, that category's tariff applies.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
EV/LT-8Electric Vehicle Charging StationVerified
Public charging station (LT-8), RERC order Annexure C.
| Units | Rate |
|---|---|
| All units | ₹6.00 /kWh |
Slabs counted on per month, units.
Fixed charge: None
Time of day: Connected load above 10 kW: +5% 06-08 h, -10% 12-16 h, +10% 18-22 h.
Source: RERC Order on Petitions 2378-2380/2025 (True up 2024-25, ARR and Tariff FY 2026-27 of JVVNL, AVVNL, JdVVNL) dt 30-03-2026, Annexure C, Annexure C pp.333-338. Open the order
Rajasthan bill questions
How much is the electricity bill for 100 units in Rajasthan?
About ₹0.00 for 100 units in a month, using the current RERC tariff. Urban, single phase. With Mukhyamantri Nishulk Bijli Yojana applied (on by default; see Government schemes below). Electricity duty and the monthly fuel surcharge are not included.
What will 200 or 300 units cost in Rajasthan?
Roughly ₹850.00 for 200 units, and ₹2,115.00 for 300 units. Use the calculator above for your exact units and load.
Are Rajasthan domestic slabs telescopic?
Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.
How often are Rajasthan electricity bills issued?
Homes are billed monthly. Enter the units for one billing period.
Which tariff order are these Rajasthan rates from?
True up 2024-25, ARR, Tariff and Investment Plan 2026-27 of Discoms (JVVNL, AVVNL, JdVVNL), dated 30 March 2026, in force from 1 April 2026. A link to the PDF is in the sources box on this page.
What does this estimate leave out?
Fixed-charge band (GD-1 to GD-4) uses this month's units; discoms may assign the band from past consumption. No water conservation cess on domestic use (Duty Act s.3B). Urban cess only in municipal areas, and not up to 100 units a month (s.3C). The duty rate comes from a State investment-portal table, not the notification.
Where is the consumer number on my Rajasthan electricity bill?
The name differs by discom. JVVNL: K No. (के.नं.); JdVVNL: K. No. (12 digits); TP Ajmer (TPADL): CA No (12 digits). The table on this page shows where each discom prints it, when its official pages say so.
Where to find your consumer number
Your bill shows a number that identifies your connection. In Rajasthan the discoms call it:
| Discom | Name on the bill | Digits | Where to find it | Source |
|---|---|---|---|---|
| JVVNL | K No. (के.नं.) | — | — | JVVNL Terms and Conditions for Supply of Electricity 2021 (P |
| JdVVNL | K. No. | 12 | At the top left, in large print, above your name. | JdVVNL bill (sample bill, August 2026) |
| TP Ajmer (TPADL) | CA No. | 12 | At the top, in the third column, on the first line. The K No. line is below it. | TP Ajmer bill (sample bill, May 2026) |
From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.
We could not read official pages for AVVNL, so they are not in the table.