Torrent Power Surat electricity bill calculator
Torrent Power Limited (Torrent Power Surat) supplies electricity in Surat City. It has its own home tariff, set by GERC (Gujarat Electricity Regulatory Commission). It does not bill on the DGVCL, MGVCL, PGVCL, UGVCL tariff. Work out your bill below.
- Surat City
- Own tariff: GERC (Gujarat Electricity Regulatory Commission)
- Official sources only
Enter your units to see the bill.
Example Torrent Power Surat bills
| Units in the month | Bill |
|---|---|
| 100 units | ₹612 |
| 200 units | ₹1,281 |
| 300 units | ₹1,990 |
| 500 units | ₹3,488 |
The calculator does not add the periodic FPPAS (a % that changes each quarter). Torrent Power has not published the current value where we could read it. Enter it from your bill.
The calculator does not add electricity duty (15% for homes in Torrent Power’s FAQ). We have not read the current notification.
Some homes get a bill every two months. Enter one month’s units: the rates are per month.
Torrent Power Surat home tariff
RGP: Residential (RGP, other than BPL). Each block of units has its own rate.
| Units | Rate |
|---|---|
| 1–50 | ₹3.20 /kWh |
| 51–100 | ₹3.65 /kWh |
| 101–250 | ₹4.25 /kWh |
| Above 250 | ₹5.05 /kWh |
- Fixed charge
- ₹25 a month for a single-phase connection, ₹65 for three phase. Single phase is up to 6 kW.
- Base FPPAS
- ₹2.44 a unit, on every unit (fixed in the Surat tariff order).
- Discounts
- None for homes in this order. A green tariff of ₹0.75 a unit is optional.
- Periodic FPPAS
- A % of the energy charge, base FPPAS and fixed charge. GERC set it to change each quarter from 2026-27. We could not find the current value, so type it from your bill.
- Electricity duty
- 15% for homes, as Torrent Power’s FAQ lists it.
We have not read a current notification, so the calculator does not add it.
Torrent Power Surat against the DGVCL, MGVCL, PGVCL, UGVCL tariff
| A month | Torrent Power Surat | DGVCL, MGVCL, PGVCL, UGVCL tariff |
|---|---|---|
| 100 units | ₹612 | ₹611 |
| 200 units | ₹1,281 | ₹1,297 |
| 300 units | ₹1,990 | ₹2,038 |
| 500 units | ₹3,488 | ₹3,629 |
Same home, same options, on the two tariffs. Only the Torrent Power Surat column applies to Torrent Power Surat homes. Each tariff includes the charges our calculator can confirm, as listed on its page. The Torrent Power column has the base FPPAS but not the periodic FPPAS. The state discom column includes its variable FPPAS (3.99%).
About Torrent Power Surat
- Head office
- Ahmedabad
- Cities
- Surat City
The list comes from this official document. Changes after its date may not show here. - Website
- torrentpower.com
- Pay your bill
- Official bill payment page
- Complaints and help
- +91 90 9999 1912 Distribution - Surat phone
We do not take payments or complaints. Use the official channels above.
Questions
Which areas does Torrent Power Surat supply?
Torrent Power Surat supplies Surat City. Your bill shows the name of your supplier.
Why is a Torrent Power Surat bill different from a state discom bill?
GERC (Gujarat Electricity Regulatory Commission) sets a separate tariff for Torrent Power Surat. Its slabs, fixed charge and FPPAS are different. Use this calculator, not the Gujarat state calculator.
What is the FPPAS on my Torrent Power Surat bill?
It is a charge for changes in the cost of fuel and power purchase. Torrent Power Surat sets it, and it can change each quarter. Type the value on your bill into the calculator.
What is the Torrent Power Surat complaint number?
Torrent Power Surat lists +91 90 9999 1912 on its official site. 1912 is the national number for power complaints.
How do I pay my Torrent Power Surat bill online?
Use the official payment page on the Torrent Power Surat website. Do not share OTPs or card details on other sites.
Sources
- gercin.org/viewdocument/T3JkZXJzX2ZpbGVzXzU2NjJfMjctMDctMjAyNl8yMjg2NjIx
- gercin.org/viewdocument/dGFyaWZmc2NoZWR1bGVfcGRmXzE3ODYwOTcyNThfODA2Mw==
- connect.torrentpower.com/tplcp/pages/faqandfeedback
- gercin.org/viewdocument/T3JkZXJzX2ZpbGVzXzU2NjFfMjctMDctMjAyNl81MDA4MjU4
- gercin.org/viewdocument/dGFyaWZmc2NoZWR1bGVfcGRmXzE3ODYwOTcyNDZfMzIzMw==
- www.torrentpower.com/index.php/site/info/contactus_ho
- www.torrentpower.com/index.php/site/info/contactus_dist
- gercin.org/forum_address
- connect.torrentpower.com/tplcp/
- connect.torrentpower.com/tplcp/pages/payment-options
Read on 17 October 2026. Torrent Power Surat and GERC (Gujarat Electricity Regulatory Commission) have the final word.