ebbillcalc

Chandigarh electricity bill calculator

Work out your CPDL electricity bill from the tariff set by JERC (Goa & UTs). Enter the units from your meter reading and see the bill built slab by slab. Got a bill already? Use the Chandigarh bijli bill check to test each line.

  • Billed monthly
  • Order dated 30 October 2025
  • Rates checked 15 October 2026

Enter your units to see the bill.

Domestic rates

What a home on the Domestic (demand based, up to 85 kW) tariff (LTDS-II) pays per unit after any subsidy built into the tariff.

Units per monthRate you pay
1–100₹2.95
101–200₹3.75
201–300₹4.80
301–400₹5.00
Above 400₹5.40

Fixed charge: ₹30 per kW (or part) per month

Example bills

Units per monthBillAverage per unit
50₹207.50₹4.15
100₹355.00₹3.55
150₹542.50₹3.62
200₹730.00₹3.65
300₹1,210.00₹4.03
500₹2,250.00₹4.50

Sanctioned load 2 kW, urban, single phase. Duty and fuel surcharge excluded.

Where these rates come from

Regulator
JERC (Goa & UTs)
Order
JERC MYT Retail Tariff Order for CPDL, FY 2025-26 to FY 2029-30 (FY 2026-27 rates)
Dated
30 October 2025
In force from
1 April 2026 (FY 2026-27 column)
Distributors
Chandigarh Power Distribution Ltd (CPDL)
Billing
Monthly
Document
Open the tariff order (PDF)

Not in this estimate

  • Electricity duty and FPPCA not included.

All LT tariff categories in Chandigarh

Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.

LTDS-IDomestic BPL (load up to 250 W, up to 100 units/month)Verified
UnitsRate
1–100₹2.90 /kWh

Fixed charge: ₹30 per connection per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.149; 1.1 p.153 (column order confirmed visually). Open the order

LTDS-IIDomestic (demand based, up to 85 kW)Verified
UnitsRate
1–100₹2.95 /kWh
101–200₹3.75 /kWh
201–300₹4.80 /kWh
301–400₹5.00 /kWh
Above 400₹5.40 /kWh

Slabs are telescopic: each band of units is charged at its own rate.

Fixed charge: ₹30 per kW (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.149; 1.2 p.153-154 (column order confirmed visually). Open the order

LTDS-IIIDomestic mixed (small shop/clinic/office in a home)Verified
UnitsRate
1–100₹3.00 /kWh
101–200₹3.80 /kWh
201–300₹4.85 /kWh
301–400₹5.05 /kWh
Above 400₹5.45 /kWh

Slabs are telescopic: each band of units is charged at its own rate.

Fixed charge: ₹30 per kW (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.149 (column order confirmed visually). Open the order

NDS-INon-domestic - shops, offices, hospitals, Govt offices etc.Verified
UnitsRate
1–100₹4.60 /kVAh
101–200₹4.80 /kVAh
Above 200₹5.75 /kVAh

Slabs are telescopic: each band of units is charged at its own rate.

Fixed charge: ₹120 per kVA (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.149 (column order confirmed visually). Open the order

NDS-IINon-domestic - hotels, restaurants, guest houses, PGs, farm housesVerified
UnitsRate
1–100₹4.65 /kVAh
101–200₹4.75 /kVAh
Above 200₹5.80 /kVAh

Slabs are telescopic: each band of units is charged at its own rate.

Fixed charge: ₹120 per kVA (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.149 (column order confirmed visually). Open the order

NDS-IIIHoardings / sign boardsVerified
UnitsRate
All units₹6.70 /kVAh

Fixed charge: ₹160 per kVA (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.150 (column order confirmed visually). Open the order

NDS-IVGovt educational institutions, hospitals; non-profit institutionsVerified
UnitsRate
All units₹5.55 /kVAh

Fixed charge: ₹120 per kVA (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.150 (column order confirmed visually). Open the order

NDS-VPlaces of worshipVerified
UnitsRate
All units₹2.95 /kWh

Fixed charge: ₹30 per kW (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.150 (column order confirmed visually). Open the order

LTAS-IAgriculture up to 10 kWVerified
UnitsRate
All units₹2.90 /kWh

Fixed charge: ₹10 per kW (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.150 (column order confirmed visually). Open the order

LTAS-IIAgriculture above 10 kW up to 85 kWVerified
UnitsRate
All units₹2.95 /kVAh

Fixed charge: ₹20 per kVA (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.150 (column order confirmed visually). Open the order

LTAS-IIIAgricultural allied (animal husbandry, poultry, fisheries etc.)Verified
UnitsRate
All units₹3.10 /kVAh

Fixed charge: ₹20 per kVA (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.150 (column order confirmed visually). Open the order

LTIS-ILT industry (up to 85 kW / 100 kVA)Verified
UnitsRate
1–500₹4.50 /kVAh
501–1000₹4.60 /kVAh
Above 1000₹4.70 /kVAh

Slabs are telescopic: each band of units is charged at its own rate.

Fixed charge: ₹210 per kVA (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.150 (column order confirmed visually). Open the order

LTPS-IPublic water works, sewerageVerified
UnitsRate
All units₹5.55 /kVAh

Fixed charge: ₹220 per kVA (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.151 (column order confirmed visually). Open the order

LTPS-IIStreet lights incl. mast lightsVerified
UnitsRate
All units₹5.55 /kWh

Fixed charge: ₹220 per kW (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.151 (column order confirmed visually). Open the order

LTPS-IIIPublic utility (MES/defence, railways) LTVerified
UnitsRate
All units₹5.55 /kWh

Fixed charge: ₹220 per kW (or part) per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.151 (column order confirmed visually). Open the order

LTEV-IEV charging stations (public and captive, up to 150 kW)Verified
UnitsRate
All units₹4.40 /kVAh

Fixed charge: ₹30 per kVA per month

Source: JERC (Goa & UTs) Tariff Order: ARR and Determination of Retail Tariff for 4th MYT Control Period FY 2025-26 to FY 2029-30, Chandigarh Power Distribution Ltd (Petition No. 150/2025, 30-10-2025) - Ch.8 Table 121 (FY 2026-27 column), Table 121 p.151 (column order confirmed visually). Open the order

Chandigarh bill questions

How much is the electricity bill for 100 units in Chandigarh?

About ₹355.00 for 100 units in a month, using the current JERC (Goa & UTs) tariff. Sanctioned load 2 kW, urban, single phase. Electricity duty and the monthly fuel surcharge are not included.

What will 200 or 300 units cost in Chandigarh?

Roughly ₹730.00 for 200 units, and ₹1,210.00 for 300 units. Use the calculator above for your exact units and load.

Are Chandigarh domestic slabs telescopic?

Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.

How often are Chandigarh electricity bills issued?

Homes are billed monthly. Enter the units for one billing period.

Which tariff order are these Chandigarh rates from?

JERC MYT Retail Tariff Order for CPDL, FY 2025-26 to FY 2029-30 (FY 2026-27 rates), dated 30 October 2025, in force from 1 April 2026 (FY 2026-27 column). A link to the PDF is in the sources box on this page.

What does this estimate leave out?

Electricity duty and FPPCA not included.