MPEB bill calculator: Madhya Pradesh bijli bill
Work out your MPEB (MP discoms) electricity bill from the tariff set by MPERC. Enter the units from your meter reading and see the bill built slab by slab. MPEB is the old Madhya Pradesh Electricity Board. Three discoms (East, Central and West) now bill homes. All three use the same MPERC tariff. Got a bill already? Use the Madhya Pradesh bijli bill check to test each line.
- Billed monthly
- Order dated 26 March 2026
- Rates checked 15 October 2026
Enter your units to see the bill.
Domestic rates
What a home on the Domestic (metered) tariff (LV 1.2(i)) pays per unit after any subsidy built into the tariff.
| Units per month | Rate you pay |
|---|---|
| 1–50 | ₹4.71 |
| 51–150 | ₹5.67 |
| 151–300 | ₹7.05 |
| Above 300 | ₹7.24 |
Fixed charge: by monthly consumption: up to 50 units Rs 81 urban / 67 rural per connection; 51-150 units Rs 134 / 111 per connection; above 150 units Rs 30 urban / 28 rural per 0.1 kW of 'load'
Example bills
| Units per month | Bill | Average per unit |
|---|---|---|
| 50 | ₹100.00 | ₹2.00 |
| 100 | ₹100.00 | ₹1.00 |
| 150 | ₹383.50 | ₹2.56 |
| 200 | ₹1,575.00 | ₹7.88 |
| 300 | ₹2,460.00 | ₹8.20 |
| 500 | ₹4,328.00 | ₹8.66 |
Urban, single phase. With Atal Griha Jyoti Yojana applied (on by default; see Government schemes below). Duty and fuel surcharge excluded.
Where these rates come from
- Regulator
- MPERC
- Order
- MPERC ARR and Retail Supply Tariff Order FY 2026-27
- Dated
- 26 March 2026
- In force from
- 7 days after the DISCOMs' public notice
- Distributors
- MP Poorv Kshetra VVCL (East, Jabalpur); MP Paschim Kshetra VVCL (West, Indore); MP Madhya Kshetra VVCL (Central, Bhopal)
- Billing
- Monthly
- Document
- Open the tariff order (PDF)
Not in this estimate
- Above 150 units the fixed charge is per 0.1 kW of deemed load (every 15 units = 0.1 kW).
- Electricity duty and FPPAS not included.
- The calculator adds FPPAS at 5.063% (bills for one month from 24 September 2026); you can switch it off. The example bills leave it out.
Government schemes in Madhya Pradesh
Schemes that change what a home pays, read from the government order, the regulator’s order or the discom’s own notice. Checked 15 October 2026.
Atal Griha Jyoti Yojana In the calculator, on by default
Domestic consumers who use up to 150 units in a month (at most 5 units a day) pay at most Rs 100 for the first 100 units; a smaller bill is paid as it is. The State pays the difference. Units 101–150 are billed at the tariff rate. Above 150 units there is no subsidy that month. The billing system applies it; there is nothing to apply for.
- The releases do not say which charges are inside the Rs 100. We count the energy charge of the first 100 units and the fixed charge.
- We use a 30-day month (150 units). Your discom scales the limit to the days billed.
- A 1 kW load limit appears in the 2019 scheme page but not in the 2024–2026 releases; we do not apply it.
Source: GoMP Finance Department, Budget 2026-27 press note (Atal Grih Jyoti: Rs 6,033 crore) GoMP Public Relations releases (mpinfo.org): Energy Minister 26-03-2026; MP Central discom 22-07-2025 (5 units a day, above 150) Dhar district (NIC) scheme page, Energy Department, 01-09-2019 MPERC order, Petition 140/2025, FY 2026-27, para 1.27
All LT tariff categories in Madhya Pradesh
Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.
LV 1.1Domestic - lifeline (load up to 0.1 kW and up to 30 units/month)Verified
| Units | Rate |
|---|---|
| All units | ₹3.72 /kWh |
Fixed charge: None
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.200. Open the order
LV 1.2(i)Domestic (metered)Verified
Residential; also dharamshalas, gaushalas, old age homes, orphanages, registered home stays, places of worship
| Units | Rate |
|---|---|
| 1–50 | ₹4.71 /kWh |
| 51–150 | ₹5.67 /kWh |
| 151–300 | ₹7.05 /kWh |
| Above 300 | ₹7.24 /kWh |
Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on units per month (prorated for reading periods other than a month).
Fixed charge: by monthly consumption: up to 50 units Rs 81 urban / 67 rural per connection; 51-150 units Rs 134 / 111 per connection; above 150 units Rs 30 urban / 28 rural per 0.1 kW of 'load'
Prepaid consumers: 25 paise/unit rebate on energy charges. Online payment rebate 0.5% of bill (no cap for domestic). ToD (p.219-220): load above 10 kW - peak (6-9, 17-22 h) +10%, solar hours (9-17 h) -20%; smart-meter consumers up to 10 kW - solar hours -20%.
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, pp.200-202; ToD pp.219-220; online rebate p.217. Open the order
LV 1.2(ii)-TDomestic temporary - social/marriage/religious functionsVerified
| Units | Rate |
|---|---|
| All units | ₹8.94 /kWh |
Fixed charge: ₹87 per kW per 24 hours urban (72 rural)
Temporary connection for construction of own house: 1.25 x LV 1.2(i).
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.201. Open the order
LV 1.2(ii)-JJhuggi/jhopadi clusters via DTR meterVerified
| Units | Rate |
|---|---|
| All units | ₹4.17 /kWh |
Fixed charge: None
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.202. Open the order
LV 1.2(iii)Un-metered rural domestic (load up to 500 W)Verified
| Units | Rate |
|---|---|
| All units | ₹5.74 /kWh |
Fixed charge: ₹122 per connection per month; billed at 75 units/month
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.202. Open the order
LV 2.1Non-domestic - schools, educational institutions, student/working-women hostelsVerified
Sanctioned-load tariff (connected load up to 10 kW)
| Units | Rate |
|---|---|
| All units | ₹7.00 /kWh |
₹172 Rs/kW urban (141 rural)
Demand-based tariff (mandatory above 10 kW)
| Units | Rate |
|---|---|
| All units | ₹7.20 /kWh |
₹291 Rs/kW or 233/kVA urban; 251/kW or 201/kVA rural
Fixed charge: see tables
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.203. Open the order
LV 2.2Non-domestic - shops, offices, hospitals, hotels, restaurants, cinemas, petrol pumps, telecom towers and all othersVerified
Load up to 10 kW, consumption up to 50 units/month
| Units | Rate |
|---|---|
| All units | ₹6.80 /kWh |
₹98 Rs/kW urban (83 rural)
Load up to 10 kW, consumption above 50 units/month
| Units | Rate |
|---|---|
| All units | ₹8.30 /kWh |
₹154 Rs/kW urban (133 rural)
Demand-based tariff (mandatory above 10 kW)
| Units | Rate |
|---|---|
| All units | ₹7.40 /kWh |
₹312 Rs/kW or 250/kVA urban; 230/kW or 184/kVA rural
Temporary (incl. mela), LV 2.1/2.2
| Units | Rate |
|---|---|
| All units | ₹9.20 /kWh |
₹240 Rs/kW urban (211 rural)
Temporary for marriages
| Units | Rate |
|---|---|
| All units | ₹9.20 /kWh |
₹103 Rs/kW per 24 h urban (83 rural)
Fixed charge: see tables
ToD for load above 10 kW: peak +20%, solar hours -20% (p.220).
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, pp.203-205. Open the order
LV 3 (urban)Public water works & street lights - municipal corporation / cantonment / municipality / nagar panchayatVerified
| Units | Rate |
|---|---|
| All units | ₹6.38 /kWh |
Fixed charge: ₹389 Rs/kW per month
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.206. Open the order
LV 3 (GP)Public water works & street lights - gram panchayatVerified
| Units | Rate |
|---|---|
| All units | ₹6.10 /kWh |
Fixed charge: ₹208 Rs/kW per month
5% incentive on energy charges for energy-saving devices.
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.206. Open the order
LV 4.1aLT industrial (non-seasonal, demand-based)Verified
| Units | Rate |
|---|---|
| All units | ₹7.05 /kWh |
Fixed charge: ₹336 Rs/kW or 269/kVA urban; 221/kW or 177/kVA rural
Contract demand up to 20 HP/15 kW: energy and fixed charges 30% lower (not in a month when recorded MD exceeds 20 HP/15 kW). Seasonal off-season: 120% of energy rate, fixed on 10% of CD (p.208). ToD: peak +20%, solar -20%.
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.207. Open the order
LV 5.1Agriculture (metered pumps, chaff cutters, threshers, lift irrigation)Verified
| Units | Rate |
|---|---|
| 1–300 | ₹5.33 /kWh |
| 301–750 | ₹6.36 /kWh |
| Above 750 | ₹6.64 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: Rs/HP per month by slab: 77 (first 300 units) / 93 (301-750) / 101 (rest)
Temporary: 6.64 + Rs 101/HP. DTR-metered group: 5.13, no fixed charge. GoMP subsidy (Section 65) applies to many farmers; not shown here. No ToD.
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.210. Open the order
LV 5.2Nurseries, flower/plant/fruit farms, mushroom, grasslandsVerified
| Units | Rate |
|---|---|
| 1–300 | ₹5.33 /kWh |
| 301–750 | ₹6.36 /kWh |
| Above 750 | ₹6.64 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: Rs/HP per month by slab: 77 / 93 / 101
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.210. Open the order
LV 5.3Fisheries, aquaculture, sericulture, hatcheries, poultry, cattle breeding, milk chillingVerified
Up to 25 HP, urban
| Units | Rate |
|---|---|
| All units | ₹5.89 /kWh |
₹139 Rs/HP
Up to 25 HP, rural
| Units | Rate |
|---|---|
| All units | ₹5.72 /kWh |
₹108 Rs/HP
Demand-based above 25 HP, urban
| Units | Rate |
|---|---|
| All units | ₹6.64 /kWh |
₹298 Rs/kW or 238/kVA
Demand-based above 25 HP, rural
| Units | Rate |
|---|---|
| All units | ₹6.64 /kWh |
₹167 Rs/kW or 134/kVA
Fixed charge: see tables
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.210. Open the order
LV 5.4Agriculture - flat-rate (unmetered) pumpsVerified
Fixed charge: LV 5.1 rates on assessed units: 95 units/HP/month Apr-Sep; 170 (3-phase) / 180 (1-phase) Oct-Mar
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, pp.210-211. Open the order
LV 6EV / e-rickshaw charging and battery swapping stationsVerified
| Units | Rate |
|---|---|
| All units | ₹7.44 /kWh |
Fixed charge: None
Solar hours (9-17 h): 20% rebate; other hours: 20% surcharge.
Source: MPERC Aggregate Revenue Requirement and Retail Supply Tariff Order for FY 2026-27 (Petition No. 140/2025, order dt 26-03-2026), Annexure-2 Tariff Schedules for LT consumers, p.214. Open the order
Madhya Pradesh bill questions
How much is the electricity bill for 100 units in Madhya Pradesh?
About ₹100.00 for 100 units in a month, using the current MPERC tariff. Urban, single phase. With Atal Griha Jyoti Yojana applied (on by default; see Government schemes below). Electricity duty and the monthly fuel surcharge are not included.
What will 200 or 300 units cost in Madhya Pradesh?
Roughly ₹1,575.00 for 200 units, and ₹2,460.00 for 300 units. Use the calculator above for your exact units and load.
Are Madhya Pradesh domestic slabs telescopic?
Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.
How often are Madhya Pradesh electricity bills issued?
Homes are billed monthly. Enter the units for one billing period.
Which tariff order are these Madhya Pradesh rates from?
MPERC ARR and Retail Supply Tariff Order FY 2026-27, dated 26 March 2026, in force from 7 days after the DISCOMs' public notice. A link to the PDF is in the sources box on this page.
What does this estimate leave out?
Above 150 units the fixed charge is per 0.1 kW of deemed load (every 15 units = 0.1 kW). Electricity duty and FPPAS not included. The calculator adds FPPAS at 5.063% (bills for one month from 24 September 2026); you can switch it off. The example bills leave it out.
Is MPEB the same as the MP discoms?
MPEB is the old Madhya Pradesh Electricity Board. Three discoms (East, Central and West) now bill homes. All three use the same MPERC tariff.
Where is the consumer number on my Madhya Pradesh electricity bill?
The name differs by discom. MPMKVVCL (Central, Bhopal): IVRS. The table on this page shows where each discom prints it, when its official pages say so.
Where to find your consumer number
Your bill shows a number that identifies your connection. In Madhya Pradesh the discom calls it:
| Discom | Name on the bill | Digits | Where to find it | Source |
|---|---|---|---|---|
| MPMKVVCL (Central, Bhopal) | IVRS | — | At the top left, on the first line. The longer Service Number is below it. | MPMKVVCL bill (sample bill, July 2016) |
From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.
We could not read official pages for MPPKVVCL (West, Indore), MPPoKVVCL (East, Jabalpur), so they are not in the table.