ebbillcalc

Sikkim electricity bill calculator

Work out your Power Department electricity bill from the tariff set by SSERC. Enter the units from your meter reading and see the bill built slab by slab.

  • Billed monthly
  • Order dated 30 June 2026
  • Rates checked 15 October 2026

Enter your units to see the bill.

Domestic rates

What a home on the Domestic supply tariff (DS) pays per unit after any subsidy built into the tariff.

Units per monthRate you pay
1–50₹2.40
51–100₹3.40
101–200₹4.40
201–400₹4.90
Above 400₹5.40

Fixed charge: No fixed charge; monthly minimum charge (see the category details below)

Example bills

Units per monthBillAverage per unit
50₹160.00₹3.20
100₹330.00₹3.30
150₹550.00₹3.67
200₹770.00₹3.85
300₹1,260.00₹4.20
500₹2,290.00₹4.58

Urban, single phase. Duty and fuel surcharge excluded.

Where these rates come from

Regulator
SSERC
Order
SSERC Tariff Order FY 2026-27 for Power Department, Sikkim
Dated
30 June 2026
In force from
1 July 2026
Distributors
Power Department, Government of Sikkim (PDS)
Billing
Monthly
Document
Open the tariff order (PDF)

Not in this estimate

  • DS is single-read: not yet confirmed
  • Slabs applied telescopically; the order does not say. FPPAS and duty not included.

All LT tariff categories in Sikkim

Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.

DSDomestic supplyRead once

Private houses, flats, Govt residential buildings, Govt schools, rural homestays; charitable organisations after verification

UnitsRate
1–50₹2.40 /kWh
51–100₹3.40 /kWh
101–200₹4.40 /kWh
201–400₹4.90 /kWh
Above 400₹5.40 /kWh

Slabs are telescopic: each band of units is charged at its own rate.

Monthly minimum charge - single phase

Rs 100

Monthly minimum charge - three phase

Rs 200

Fixed charge: No fixed charge; monthly minimum charge (see the category details below)

Each slab is Re 0.80 above FY 2025-26 (1.60 / 2.60 / 3.60 / 4.10 / 4.60). The order lists slabs but does not say whether they are applied telescopically or to all units; Confirm on a bill. Domestic use for commercial purpose is billed entirely as CS.

Source: SSERC Tariff Order FY 2026-27 for Power Department, Government of Sikkim (Case No. P-01/PDS/2026, 30-06-2026), Appendix Tariff Schedule, Appendix I, printed p.119; Table 9.2 p.108. Open the order

DS-SPArmy pensioners / blind-headed households / places of worshipVerified

Lists from Rajya Sainik Board, National Association for Blinds, Ecclesiastical Dept

Up to 100 units

Billed to the sponsoring Govt department (Rajya Sainik Board / Social Welfare / Ecclesiastical)

101 units and above

Billed to the consumer at DS rates

Fixed charge: As DS

Source: SSERC Tariff Order FY 2026-27 for Power Department, Government of Sikkim (Case No. P-01/PDS/2026, 30-06-2026), Appendix Tariff Schedule, Appendix VI-VIII, printed p.124-125. Open the order

CSCommercial supplyRead once

Shops, hotels, restaurants, urban homestays, clinics, private schools, banks, petrol pumps etc.

UnitsRate
1–50₹5.05 /kWh
51–100₹6.05 /kWh
101–200₹7.05 /kWh
201–400₹8.05 /kWh
Above 400₹8.35 /kWh

Slabs are telescopic: each band of units is charged at its own rate.

Sanctioned load below 25 kVA - minimum

1-ph Rs 300; 3-ph Rs 500 per month

25 kVA and above on shared transformer

Demand charge Rs 60/kVA (rural) or Rs 100/kVA (urban) per month plus energy; demand charge is the minimum

Fixed charge: see tables

Urban homestays with 2 kWp+ rooftop solar get DS rates. The order lists slabs but does not say whether they are applied telescopically or to all units; Confirm on a bill.

Source: SSERC Tariff Order FY 2026-27 for Power Department, Government of Sikkim (Case No. P-01/PDS/2026, 30-06-2026), Appendix Tariff Schedule, Appendix II, printed p.120-121. Open the order

LTISLT industrial supply (3-phase, up to 25 kVA connected load)Read once

Poultry, hatcheries, welding, sheet metal, auto workshops, small-scale units

UnitsRate
1–500₹6.91 /kVAh
501–1000₹7.91 /kVAh
Above 1000₹8.91 /kVAh

Slabs are telescopic: each band of units is charged at its own rate. Slabs counted on kVAh per month.

Contract demand 50 kVA and below

Minimum Rs 500 per month

Contract demand above 50 kVA

Minimum Rs 200/kVA of sanctioned load per month

25-100 kVA on shared transformer

Demand charge Rs 100/kVA/month plus energy

Fixed charge: see tables

Rural/urban split removed; single LTIS category. The order lists slabs but does not say whether they are applied telescopically or to all units; Confirm on a bill.

Source: SSERC Tariff Order FY 2026-27 for Power Department, Government of Sikkim (Case No. P-01/PDS/2026, 30-06-2026), Appendix Tariff Schedule, Appendix III, printed p.121. Open the order

BSBulk supply (non-commercial): MES, BRO, SAP, EV charging stations, Govt non-residential buildings and hospitals, aerodromesVerified
UnitsRate
All units₹7.95 /kWh

Contract demand 50 kVA and below

Minimum Rs 500 per month

Above 50 kVA

Minimum Rs 150/kVA of sanctioned load per month

Fixed charge: see tables

LT or HT, same rate.

Source: SSERC Tariff Order FY 2026-27 for Power Department, Government of Sikkim (Case No. P-01/PDS/2026, 30-06-2026), Appendix Tariff Schedule, Appendix V, printed p.123. Open the order

PLPublic lightingVerified

Paid by UD&HD / municipal body (urban) or Panchayat / RM&DD (rural)

UnitsRate
All units₹7.46 /kWh

Fixed charge: None

Source: SSERC Tariff Order FY 2026-27 for Power Department, Government of Sikkim (Case No. P-01/PDS/2026, 30-06-2026), Appendix Tariff Schedule, Appendix IX, printed p.125. Open the order

TSTemporary supplyVerified

All

Twice the DS/CS/LTIS/HTS tariff for the corresponding permanent supply; two months' assessed bill as security

Fixed charge: n/a

Prepaid meters mandatory in notified municipal towns below 45 kW.

Source: SSERC Tariff Order FY 2026-27 for Power Department, Government of Sikkim (Case No. P-01/PDS/2026, 30-06-2026), Appendix Tariff Schedule, Appendix X, printed p.125. Open the order

Sikkim bill questions

How much is the electricity bill for 100 units in Sikkim?

About ₹330.00 for 100 units in a month, using the current SSERC tariff. Urban, single phase. Electricity duty and the monthly fuel surcharge are not included.

What will 200 or 300 units cost in Sikkim?

Roughly ₹770.00 for 200 units, and ₹1,260.00 for 300 units. Use the calculator above for your exact units and load.

Are Sikkim domestic slabs telescopic?

Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.

How often are Sikkim electricity bills issued?

Homes are billed monthly. Enter the units for one billing period.

Which tariff order are these Sikkim rates from?

SSERC Tariff Order FY 2026-27 for Power Department, Sikkim, dated 30 June 2026, in force from 1 July 2026. A link to the PDF is in the sources box on this page.

What does this estimate leave out?

DS is single-read: not yet confirmed Slabs applied telescopically; the order does not say. FPPAS and duty not included.

Where is the consumer number on my Sikkim electricity bill?

The name differs by discom. Power Department, Sikkim: Contract Acc. No (9 digits). The table on this page shows where each discom prints it, when its official pages say so.

Where to find your consumer number

Your bill shows a number that identifies your connection. In Sikkim the discom calls it:

DiscomName on the billDigitsWhere to find itSource
Power Department, SikkimContract Acc. No.9In the right column, at the end of the top block, below Consumer ID.Sikkim Power Department bill (sample bill, August 2024)

From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.