Mizoram electricity bill calculator
Work out your Power & Electricity Department electricity bill from the tariff set by MZERC. Enter the units from your meter reading and see the bill built slab by slab.
- Billed monthly
- Order dated 25 March 2026
- Rates checked 15 October 2026
Enter your units to see the bill.
Domestic rates
What a home on the Domestic tariff (LT-2) pays per unit after any subsidy built into the tariff.
| Units per month | Rate you pay |
|---|---|
| 1–100 | ₹4.90 |
| 101–200 | ₹7.10 |
| Above 200 | ₹8.20 |
Fixed charge: ₹50 per kW of contracted load per month
Example bills
| Units per month | Bill | Average per unit |
|---|---|---|
| 50 | ₹345.00 | ₹6.90 |
| 100 | ₹590.00 | ₹5.90 |
| 150 | ₹945.00 | ₹6.30 |
| 200 | ₹1,300.00 | ₹6.50 |
| 300 | ₹2,120.00 | ₹7.07 |
| 500 | ₹3,760.00 | ₹7.52 |
Sanctioned load 2 kW, urban, single phase. Duty and fuel surcharge excluded.
Where these rates come from
- Regulator
- MZERC
- Order
- MZERC Retail Tariff Order FY 2026-27 for P&ED Mizoram (subsidised tariff)
- Dated
- 25 March 2026
- In force from
- 1 April 2026
- Distributors
- Power & Electricity Department (P&ED), Govt of Mizoram
- Billing
- Monthly
- Document
- Open the tariff order (PDF)
Not in this estimate
- Subsidised tariff; P&ED may bill full-cost tariff B in a month the subsidy is not received.
- FPPPA and duty not included.
All LT tariff categories in Mizoram
Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.
LT-1Kutir JyotiVerified
Households connected under Kutir Jyoti or similar Govt schemes for the poorer section. If consumption in any 3 consecutive months exceeds 45 kWh, the connection is permanently converted to LT-2 Domestic.
| Units | Rate |
|---|---|
| 1–20 | ₹2.55 /kWh |
| Above 20 | ₹3.55 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Option-2 ToD (when systems ready)
06-17 h 2.45; 17-22 h 3.10; 22-06 h 1.95
Fixed charge: ₹25 per connection per month
Full-cost tariff B: 6.70 / 9.32, Rs 25/connection.
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, Tariff Schedule 2.1, printed p.239; Table 8.2 p.153. Open the order
LT-2DomesticVerified
Exclusively domestic premises with attached kitchen; each floor of a multi-storey building; orphanages / charitable institutions charging no fees
| Units | Rate |
|---|---|
| 1–100 | ₹4.90 /kWh |
| 101–200 | ₹7.10 /kWh |
| Above 200 | ₹8.20 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Option-2 ToD (when systems ready)
06-17 h 5.00; 17-22 h 6.35; 22-06 h 3.85
Fixed charge: ₹50 per kW of contracted load per month
Schedule: 'First 100 kWh, Next 100 kWh, All units above 200 kWh'. Subsidised tariff A; if the Government subsidy is not received in advance, P&ED may bill full-cost tariff B (7.67 / 14.61 / 14.71) and must refund the excess when the subsidy arrives (1.16). Option-1 (default, non-ToD) shown. Option-2 ToD rates are in the order but apply only once P&ED has metering and billing systems in place; switching allowed once a year.
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, Tariff Schedule 2.2, printed p.240-241; 1.16 p.236-237; Table 8.2-8.3 p.153-154. Open the order
LT-3Non-profit public service (Govt offices, Govt hospitals/schools, religious premises, NGOs, community halls)Verified
| Units | Rate |
|---|---|
| 1–150 | ₹7.60 /kWh |
| Above 150 | ₹8.30 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: ₹60 per kW of contracted load per month
ToD option: 6.95 / 8.90 / 5.40. Full-cost tariff B: 8.43 / 9.21.
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, 2.3 printed p.241-242. Open the order
LT-4CommercialVerified
| Units | Rate |
|---|---|
| 1–150 | ₹8.20 /kWh |
| Above 150 | ₹8.45 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: ₹80 per kW of contracted load per month
ToD option: 7.10 / 9.10 / 5.55. Full-cost tariff B: 11.31 / 11.65.
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, 2.4 printed p.242-243. Open the order
LT-5Public lightingVerified
| Units | Rate |
|---|---|
| All units | ₹11.35 /kWh |
Fixed charge: ₹80 per kW of contracted load per month
ToD option: 8.80 / 11.25 / 6.85. Full-cost tariff B: 11.72.
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, 2.5 printed p.244. Open the order
LT-6Public water works (water supply and sewerage pumping)Verified
| Units | Rate |
|---|---|
| All units | ₹11.10 /kWh |
Fixed charge: ₹90 per kW of contracted load per month
ToD option: 8.60 / 11.00 / 6.70. Full-cost tariff B: 4.92 (lower than the subsidised rate, as printed).
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, 2.6 printed p.244-245. Open the order
LT-7Irrigation & agricultureVerified
| Units | Rate |
|---|---|
| All units | ₹3.80 /kWh |
Fixed charge: ₹50 per kW of contracted load per month
No ToD. Full-cost tariff B: 11.01.
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, 2.7 printed p.245. Open the order
LT-8IndustrialVerified
| Units | Rate |
|---|---|
| 1–400 | ₹7.10 /kWh |
| Above 400 | ₹8.05 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: ₹80 per kW of contracted load per month
ToD option: 7.00 / 8.95 / 5.45. Full-cost tariff B: 9.59 / 10.29.
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, 2.8 printed p.245-246. Open the order
LT-9EV charging stations (separate connection)Verified
This tariff is applicable to those consumers who use electricity installations exclusively for charging Electric Vehicles (i.e., two-wheeler to four-wheeler). The consumer shall obtain a separate service connection for this purpose.
| Units | Rate |
|---|---|
| All units | ₹7.26 /kWh |
Fixed charge: None
ToD option: 09-16 h 7.26; 16-09 h 13.49. Home charging billed in the home's own category. Full-cost tariff B: 7.26. Option-2 ToD (09-16 h Rs 7.26, 16-09 h Rs 13.49 per the schedule; the Ch.8 table shows 7.26) starts only when P&ED systems are ready.
Source: MZERC Tariff Order for P&ED Mizoram: True-up FY 2024-25, APR FY 2025-26, ARR & Retail Tariff FY 2026-27 (Petition (ARR & Tariff) No. 1 of 2025, 25-03-2026), Appendix Tariff Schedule, Part A Subsidised Tariff, 2.9 printed p.246-247. Open the order
Mizoram bill questions
How much is the electricity bill for 100 units in Mizoram?
About ₹590.00 for 100 units in a month, using the current MZERC tariff. Sanctioned load 2 kW, urban, single phase. Electricity duty and the monthly fuel surcharge are not included.
What will 200 or 300 units cost in Mizoram?
Roughly ₹1,300.00 for 200 units, and ₹2,120.00 for 300 units. Use the calculator above for your exact units and load.
Are Mizoram domestic slabs telescopic?
Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.
How often are Mizoram electricity bills issued?
Homes are billed monthly. Enter the units for one billing period.
Which tariff order are these Mizoram rates from?
MZERC Retail Tariff Order FY 2026-27 for P&ED Mizoram (subsidised tariff), dated 25 March 2026, in force from 1 April 2026. A link to the PDF is in the sources box on this page.
What does this estimate leave out?
Subsidised tariff; P&ED may bill full-cost tariff B in a month the subsidy is not received. FPPPA and duty not included.
Where is the consumer number on my Mizoram electricity bill?
The name differs by discom. Power & Electricity Department, Mizoram: Consumer No (10 digits). The table on this page shows where each discom prints it, when its official pages say so.
Where to find your consumer number
Your bill shows a number that identifies your connection. In Mizoram the discom calls it:
| Discom | Name on the bill | Digits | Where to find it | Source |
|---|---|---|---|---|
| Power & Electricity Department, Mizoram | Consumer No. | 10 | In the yellow box at the top left, above your name. | Mizoram P&ED bill (sample bill, March 2026) |
From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.