Nagaland electricity bill calculator
Work out your Department of Power electricity bill from the tariff set by NERC (Nagaland). Enter the units from your meter reading and see the bill built slab by slab.
- Billed monthly
- Order dated 17 September 2026
- Rates checked 15 October 2026
Enter your units to see the bill.
Domestic rates
What a home on the Domestic (post-paid) tariff (A) pays per unit after any subsidy built into the tariff.
| Units per month | Rate you pay |
|---|---|
| 1–30 | ₹5.70 |
| 31–100 | ₹6.25 |
| 101–250 | ₹7.33 |
| Above 250 | ₹7.90 |
Fixed charge: No fixed charge; monthly minimum charge applies (see the category details below)
Example bills
| Units per month | Bill | Average per unit |
|---|---|---|
| 50 | ₹530.00 | ₹10.60 |
| 100 | ₹638.50 | ₹6.38 |
| 150 | ₹1,005.00 | ₹6.70 |
| 200 | ₹1,371.50 | ₹6.86 |
| 300 | ₹2,133.00 | ₹7.11 |
| 500 | ₹3,713.00 | ₹7.43 |
Sanctioned load 2 kW, urban, single phase. Duty and fuel surcharge excluded.
Where these rates come from
- Regulator
- NERC (Nagaland)
- Order
- NERC Tariff Order for DoP Nagaland, retail tariff FY 2026-27 (1 Oct 2026 - 31 Mar 2027)
- Dated
- 17 September 2026
- In force from
- 1 October 2026
- Distributors
- Department of Power, Govt of Nagaland (DoPN)
- Billing
- Monthly
- Document
- Open the tariff order (PDF)
Not in this estimate
- FPPCA and duty not included.
All LT tariff categories in Nagaland
Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.
ADomestic (post-paid)Verified
Domestic consumers
| Units | Rate |
|---|---|
| 1–30 | ₹5.70 /kWh |
| 31–100 | ₹6.25 /kWh |
| 101–250 | ₹7.33 /kWh |
| Above 250 | ₹7.90 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Monthly minimum charge - rural
Rs 200 per kW of contract demand or part thereof
Monthly minimum charge - urban
Rs 250 per kW of contract demand or part thereof
Monthly minimum charge - rooftop solar consumers
Rs 250 per month
Fixed charge: No fixed charge; monthly minimum charge applies (see the category details below)
Order (8.2.3) revises tariffs 'under Telescopic billing'. Slabs printed as 0-30, 31-100, 101-250, >250 kWh. Rates are lower than FY 2025-26 (5.90 / 6.40 / 7.15 / 7.80). Full-cost tariff if the subsidy is not received in advance: 8.38 / 9.95 / 11.52 / 13.09.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102; Table 8.4 p.103. Open the order
A-PPDomestic (prepaid)Verified
| Units | Rate |
|---|---|
| All units | ₹5.89 /kWh |
Fixed charge: No fixed charge.
Flat all-units rate as an incentive for prepaid meters. Full-cost tariff: 10.53.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.127; Table 8.6 p.106. Open the order
BIndustrialVerified
| Units | Rate |
|---|---|
| 1–500 | ₹7.15 /kWh |
| 501–5000 | ₹7.91 /kWh |
| Above 5000 | ₹8.25 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: No fixed charge. Monthly minimum Rs 250 per kVA of contract demand or part thereof.
Public-lighting charge per connection per month added to the bill: domestic Rs 10, commercial Rs 15, industrial Rs 20, bulk Rs 25. Full-cost tariff: 9.31 / 10.88 / 12.45.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
CBulk supplyVerified
| Units | Rate |
|---|---|
| All units | ₹7.75 /kWh |
Fixed charge: No fixed charge. Monthly minimum Rs 200 per kVA of contract demand or part thereof.
Public-lighting charge per connection per month added to the bill: domestic Rs 10, commercial Rs 15, industrial Rs 20, bulk Rs 25. Full-cost tariff: 10.53.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
C1Bulk domestic (residential consumers with private transformer up to 63 kVA)Verified
| Units | Rate |
|---|---|
| All units | ₹7.15 /kWh |
Fixed charge: No fixed charge. Monthly minimum Rs 200 per kVA on 40% of contract demand.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
C2Bulk - rooftop solarVerified
| Units | Rate |
|---|---|
| All units | ₹7.75 /kWh |
Fixed charge: No fixed charge. Monthly minimum Rs 200 per kVA on 40% of contract demand.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
DCommercialVerified
| Units | Rate |
|---|---|
| 1–60 | ₹8.15 /kWh |
| 61–240 | ₹9.69 /kWh |
| Above 240 | ₹9.90 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: No fixed charge. Monthly minimum Rs 250 per kW of contract demand or part thereof.
Public-lighting charge per connection per month added to the bill: domestic Rs 10, commercial Rs 15, industrial Rs 20, bulk Rs 25. Full-cost tariff: 10.24 / 11.81 / 13.38.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
EPublic water works & sewageVerified
| Units | Rate |
|---|---|
| All units | ₹8.41 /kWh |
Fixed charge: No fixed charge. Monthly minimum Rs 200 per kVA or part thereof.
Full-cost tariff: 10.53.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
FPublic lightingVerified
All
Recovered from domestic, commercial, industrial and bulk consumers as a per-connection charge (Rs 10 / 15 / 20 / 25 per month)
Fixed charge: n/a
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
HAgricultureVerified
| Units | Rate |
|---|---|
| All units | ₹3.65 /kWh |
Fixed charge: No fixed charge. Monthly minimum Rs 75 per HP or part thereof.
Full-cost tariff: 10.53.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
ITemporary connectionVerified
| Units | Rate |
|---|---|
| All units | ₹15.00 /kWh |
Fixed charge: No fixed charge.
DLF (deposit labour fund) works Rs 12.00/kWh; others Rs 15.00/kWh.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
VEMBVillage Electricity Management Board - single point (rural) and individually metered consumersVerified
| Units | Rate |
|---|---|
| All units | ₹5.90 /kWh |
Fixed charge: No fixed charge.
Full-cost tariff: 10.53.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
EVEV charging stationsVerified
| Units | Rate |
|---|---|
| All units | ₹7.79 /kWh |
Fixed charge: No fixed charge.
Full-cost tariff: 10.53.
Source: NERC (Nagaland) Tariff Order: True-up FY 2024-25, Performance Review FY 2025-26 and ARR & Tariff FY 2026-27 for DoP Nagaland (dt 17-09-2026), Appendix-II Approved Tariff Schedule, Appendix-II printed p.125-127; Table 8.3 p.101-102. Open the order
Nagaland bill questions
How much is the electricity bill for 100 units in Nagaland?
About ₹638.50 for 100 units in a month, using the current NERC (Nagaland) tariff. Sanctioned load 2 kW, urban, single phase. Electricity duty and the monthly fuel surcharge are not included.
What will 200 or 300 units cost in Nagaland?
Roughly ₹1,371.50 for 200 units, and ₹2,133.00 for 300 units. Use the calculator above for your exact units and load.
Are Nagaland domestic slabs telescopic?
Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.
How often are Nagaland electricity bills issued?
Homes are billed monthly. Enter the units for one billing period.
Which tariff order are these Nagaland rates from?
NERC Tariff Order for DoP Nagaland, retail tariff FY 2026-27 (1 Oct 2026 - 31 Mar 2027), dated 17 September 2026, in force from 1 October 2026. A link to the PDF is in the sources box on this page.
What does this estimate leave out?
FPPCA and duty not included.
Where is the consumer number on my Nagaland electricity bill?
The name differs by discom. Department of Power, Nagaland: Consumer ID (11 digits). The table on this page shows where each discom prints it, when its official pages say so.
Where to find your consumer number
Your bill shows a number that identifies your connection. In Nagaland the discom calls it:
| Discom | Name on the bill | Digits | Where to find it | Source |
|---|---|---|---|---|
| Department of Power, Nagaland | Consumer ID | 11 | In the box at the top right, on the first line, below the due date. | Nagaland Department of Power online bill (sample bill, February 2019) |
From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.