Domestic rates

What a home on the Domestic - urban (contract demand up to 70 kW) tariff (1.3 DS-II) pays per unit after any subsidy built into the tariff.

Units per monthRate you pay
All units₹7.42

Fixed charge: ₹80 per kW (or part) per month

Example bills

Units per monthBillAverage per unit
50₹0.00₹0.00
100₹0.00₹0.00
150₹263.00₹1.75
200₹469.00₹2.35
300₹881.00₹2.94
500₹1,705.00₹3.41

Sanctioned load 2 kW, urban, single phase. With Government of Bihar tariff subsidy, Mukhyamantri Vidyut Upbhokta Sahayata Yojana: 125 units free applied (on by default; see Government schemes below). Duty and fuel surcharge excluded.

Where these rates come from

Regulator
BERC
Order
BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (uniform state-wide tariff)
Dated
18 March 2026
In force from
1 April 2026
Distributors
NBPDCL (North Bihar); SBPDCL (South Bihar)
Billing
Monthly
Document
Open the tariff order (PDF)

Not in this estimate

  • BERC tariff before the State subsidy; the subsidy and the 125 free units are shown as their own lines.
  • Smart-metered homes are on mandatory ToD: 80% of the rate 09-17 h, 110% 17-23 h. This estimate uses the flat rate.
  • Electricity duty and FPPAS not included.

Government schemes in Bihar

Schemes that change what a home pays, read from the government order, the regulator’s order or the discom’s own notice. Checked 15 October 2026.

Government of Bihar tariff subsidy In the calculator, on by default

For FY 2026-27 the State Government pays Rs 4.97 of the Rs 7.42 rate for rural homes (DS-I) and Rs 3.30 for urban homes (DS-II), on every unit. The fixed charge is not subsidised.

  • Kutir Jyoti homes get Rs 5.45 off on the first 50 units only, and those units are already inside the free 125. Above 50 units they are billed as rural or urban homes. The optional DS-III group connection is not modelled.

Source: Energy Department table "rates after Government subsidy, FY 2026-27", in NBPDCL’s Tariff Schedule FY 2026-27 (04-06-2026)

Mukhyamantri Vidyut Upbhokta Sahayata Yojana: 125 units free In the calculator, on by default

From July 2025 consumption, all domestic consumers (tenants too, if the connection is in their own name) get up to 125 units a month free, covering the energy charge, fixed charge and electricity duty. The 125 units scale with the days billed (125 × days ÷ 30). Above 125 units only the extra units are billed, at the subsidised rate, with electricity duty on those units, and the fixed charge for the whole period on the higher of recorded demand or 75% of sanctioned load. Arrears from before July 2025 stay payable.

  • We use a 30-day month.
  • Electricity duty on the extra units is not part of this estimate.
  • From 01-04-2026 smart-meter homes have time-of-day rates, which change the price of units above 125; not modelled.
  • No FY 2026-27 order restates the 125 units. The FAQ is still on the NBPDCL home page and BERC’s FY 2026-27 order counts the scheme in its sales forecast.

Source: SBPDCL / NBPDCL FAQ on the 125-unit free electricity scheme (Hindi) BERC Tariff Order FY 2026-27, 18-03-2026 (SBPDCL copy), order p. 348

All LT tariff categories in Bihar

Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.

1.1 KJKutir Jyoti / BPL (load up to 250 W, up to 50 units/month)Verified
UnitsRate
All units₹7.42 /kWh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹20 per connection per month

Units above 50 billed at DS-I / DS-II rates. Fixed charge pro-rated if supply is under 21 h/day.

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514 table; Appendix-1 2.1 p.518. Open the order

1.2 DS-IDomestic - ruralVerified
UnitsRate
All units₹7.42 /kWh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹40 per kW (or part) per month

Billing demand = recorded MD or 75% of contract demand, whichever is higher; MD above 105% of CD billed at twice the rate (Appendix-1 2.2). Single slab for all units.

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514; Appendix-1 2.2 p.518. Open the order

1.3 DS-IIDomestic - urban (contract demand up to 70 kW)Verified
UnitsRate
All units₹7.42 /kWh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹80 per kW (or part) per month

Billing demand = recorded MD or 75% of contract demand, whichever is higher; MD above 105% of CD billed at twice the rate (Appendix-1 2.2). FY 2026-27 merged the two slabs (was 7.42 up to 100 units, 8.95 above).

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514; Appendix-1 2.3 p.518. Open the order

1.4 DS-IIIDomestic - group connection at single point (optional, up to 74 kW)Verified
UnitsRate
All units₹9.03 /kWh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹80 per kW (or part) per month

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

2.1 NDS-INon-domestic - ruralVerified
UnitsRate
All units₹7.79 /kVAh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹60 per kVA (or part) per month

Slabs merged in FY 2026-27 (was 8.21 above 100).

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

2.2.1 NDS-IINon-domestic - contract load up to 0.5 kWVerified
UnitsRate
All units₹7.73 /kWh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹150 per connection per month

Fixed charge cut from Rs 200.

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

2.2.2 NDS-IINon-domestic - contract demand above 0.5 kW up to 70 kWVerified
UnitsRate
All units₹7.73 /kVAh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹300 per kVA (or part) per month

Slabs merged in FY 2026-27 (was 8.93 above 100).

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

3.1 IAS-IIrrigation & agriculture - unmeteredVerified

Fixed charge: ₹1350 per HP (or part) per month

Now includes mushroom farming (excluding processing).

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

3.2 IAS-IIrrigation & agriculture - meteredVerified
UnitsRate
All units₹6.74 /kWh

Slabs counted on units per month (all units).

Fixed charge: ₹100 per HP (or part) per month

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

3.3 IAS-IIIrrigation & agriculture - metered, demand basedVerified
UnitsRate
All units₹7.17 /kVAh

Slabs counted on units per month (all units).

Fixed charge: ₹500 per kVA (or part) per month

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

4.1 LTIS-ILT industrial (0-19 kW)Verified
UnitsRate
All units₹7.79 /kVAh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹278 per kVA (or part) per month

Fixed charge cut from Rs 288.

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

4.2 LTIS-IILT industrial (above 19 kW up to 74 kW)Verified
UnitsRate
All units₹7.79 /kVAh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹350 per kVA (or part) per month

Fixed charge cut from Rs 360.

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

5.1 PWWPublic water works (demand based)Verified
UnitsRate
All units₹9.72 /kVAh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹630 per kVA (or part) per month

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

5.2 HGNHar Ghar Nal (connected load based)Verified
UnitsRate
All units₹8.16 /kWh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹100 per HP (or part) per month

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

6.1 SSStreet lights - meteredVerified
UnitsRate
All units₹9.03 /kWh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: ₹100 per kW (or part) per month

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

6.2 SSStreet lights - unmeteredVerified

Fixed charge: ₹4250 per kW (or part) per month

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

7 EVCSLT EV charging stationsVerified
UnitsRate
All units₹8.72 /kWh

Slabs counted on units per month (all units).

ToD (mandatory with smart meter, or contract demand > 10 kW): 09-17 h

80% of normal energy rate

ToD: 17-23 h (evening peak)

110% of normal energy rate (120% for NDS-I, NDS-II, LTIS-I, LTIS-II)

ToD: 23-09 h

normal energy rate

Fixed charge: None

Source: BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (Case Nos. 50/2025 & 51/2025, common order dt 18-03-2026): approved retail tariff without Govt subsidy (printed p.514-515) and Appendix-1 Tariff Schedule, printed p.514. Open the order

Bihar bill questions

How much is the electricity bill for 100 units in Bihar?

About ₹0.00 for 100 units in a month, using the current BERC tariff. Sanctioned load 2 kW, urban, single phase. With Government of Bihar tariff subsidy, Mukhyamantri Vidyut Upbhokta Sahayata Yojana: 125 units free applied (on by default; see Government schemes below). Electricity duty and the monthly fuel surcharge are not included.

What will 200 or 300 units cost in Bihar?

Roughly ₹469.00 for 200 units, and ₹881.00 for 300 units. Use the calculator above for your exact units and load.

Are Bihar domestic slabs telescopic?

There is a single rate for all units, so there are no slabs to cross.

How often are Bihar electricity bills issued?

Homes are billed monthly. Enter the units for one billing period.

Which tariff order are these Bihar rates from?

BERC Tariff Order for NBPDCL & SBPDCL, FY 2026-27 (uniform state-wide tariff), dated 18 March 2026, in force from 1 April 2026. A link to the PDF is in the sources box on this page.

What does this estimate leave out?

BERC tariff before the State subsidy; the subsidy and the 125 free units are shown as their own lines. Smart-metered homes are on mandatory ToD: 80% of the rate 09-17 h, 110% 17-23 h. This estimate uses the flat rate. Electricity duty and FPPAS not included.

Where is the consumer number on my Bihar electricity bill?

The name differs by discom. NBPDCL: CA No (9 digits); SBPDCL: CA No (9 digits). The table on this page shows where each discom prints it, when its official pages say so.

Where to find your consumer number

Your bill shows a number that identifies your connection. In Bihar the discoms call it:

DiscomName on the billDigitsWhere to find itSource
NBPDCLCA No9In the Connection Details box, on the first line. The old account number is below it.NBPDCL quick bill payment page: 'What is CANumber?' sample b
SBPDCLCA No9In the Connection Details box, on the first line. The old account number is below it.SBPDCL quick bill payment page: 'What is CANumber?' sample b

From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.