Odisha electricity bill calculator: TPCODL, TPNODL, TPSODL and TPWODL
Work out your TPCODL, TPNODL, TPWODL, TPSODL electricity bill from the tariff set by OERC. Enter the units from your meter reading and see the bill built slab by slab. All four Tata Power discoms use the same OERC tariff.
- Billed monthly
- Order dated 24 March 2026
- Rates checked 15 October 2026
Enter your units to see the bill.
Domestic rates
What a home on the Domestic - others tariff (1.b DOM) pays per unit after any subsidy built into the tariff.
| Units per month | Rate you pay |
|---|---|
| 1–50 | ₹2.90 |
| 51–200 | ₹4.70 |
| 201–400 | ₹5.70 |
| Above 400 | ₹6.10 |
Fixed charge: ₹20 Monthly minimum fixed charge 20 for the first kW/kVA (or part) + 20 for each additional kW/kVA
Example bills
| Units per month | Bill | Average per unit |
|---|---|---|
| 50 | ₹185.00 | ₹3.70 |
| 100 | ₹420.00 | ₹4.20 |
| 150 | ₹655.00 | ₹4.37 |
| 200 | ₹890.00 | ₹4.45 |
| 300 | ₹1,460.00 | ₹4.87 |
| 500 | ₹2,640.00 | ₹5.28 |
Sanctioned load 2 kW, urban, single phase. Duty and fuel surcharge excluded.
Where these rates come from
- Regulator
- OERC
- Order
- OERC common Order on ARR, Wheeling & Retail Supply Tariff FY 2026-27
- Dated
- 24 March 2026
- In force from
- 1 April 2026
- Distributors
- TPCODL (Central); TPNODL (North); TPWODL (Western); TPSODL (Southern)
- Billing
- Monthly
- Document
- Open the tariff order (PDF)
Not in this estimate
- Prompt payment earns 10 paise/unit off (20 paise for rural homes with correct meters) and 4% off for digital payment; not deducted here.
- Electricity duty and meter rent (Rs 40-60/month) not included.
All LT tariff categories in Odisha
Every low-tension category in the order: homes, shops, industry, agriculture and more. Approved rates, before any government subsidy unless the order says otherwise.
1.a KJDomestic - Kutir Jyoti (up to 30 units/month)Verified
Up to 30 units/month
fixed monthly charge Rs 70 (no energy charge)
Fixed charge: ₹70 per month (all-in)
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3 tariff table. Open the order
1.b DOMDomestic - othersVerified
| Units | Rate |
|---|---|
| 1–50 | ₹2.90 /kWh |
| 51–200 | ₹4.70 /kWh |
| 201–400 | ₹5.70 /kWh |
| Above 400 | ₹6.10 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: ₹20 Monthly minimum fixed charge 20 for the first kW/kVA (or part) + 20 for each additional kW/kVA
Rebates: 10 paise/kWh prompt payment; +10 paise/kWh rural with correct meter and timely payment (xxv); 4% for digital payment before due date (xxvi); 4% on prepaid recharge (xxvii); Rs 10 e-bill discount (xxviii). Single-phase smart meter rent Rs 60/month for 96 months (xviii).
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3 tariff table; notes pp.4-8. Open the order
2 GPGeneral purpose (< 110 kVA) - shops, offices, commercialVerified
| Units | Rate |
|---|---|
| 1–100 | ₹5.90 /kWh |
| 101–300 | ₹7.00 /kWh |
| Above 300 | ₹7.60 /kWh |
Slabs are telescopic: each band of units is charged at its own rate.
Fixed charge: ₹30 Monthly minimum fixed charge 30 for the first kW/kVA (or part) + 30 for each additional kW/kVA
Rebate 10 paise/kWh. DPS @1%/month re-introduced for GP with CD of 5 kW and above (v). ToD from 01-07-2026 for smart/AMR meters with CD > 10 kW: solar hours 08-16 h -10%, peak 18-24 h x1.1.
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3; note ix p.5. Open the order
3 IRRIrrigation pumping and agricultureVerified
| Units | Rate |
|---|---|
| All units | ₹1.50 /kWh |
Fixed charge: ₹20 Monthly minimum fixed charge 20 for the first kW/kVA (or part) + 10 for each additional kW/kVA
No ToD. Prompt-payment rebate 10 paise/kWh
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
4 AAAAllied agricultural activitiesVerified
| Units | Rate |
|---|---|
| All units | ₹1.60 /kWh |
Fixed charge: ₹20 Monthly minimum fixed charge 20 for the first kW/kVA (or part) + 10 for each additional kW/kVA
Prompt-payment rebate 10 paise/kWh
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
5 AAIAllied agro-industrial activitiesVerified
| Units | Rate |
|---|---|
| All units | ₹3.10 /kWh |
Fixed charge: ₹80 Monthly minimum fixed charge 80 for the first kW/kVA (or part) + 50 for each additional kW/kVA
Rebate/DPS.
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
6 PLPublic lightingVerified
| Units | Rate |
|---|---|
| All units | ₹6.20 /kWh |
Fixed charge: ₹20 Monthly minimum fixed charge 20 for the first kW/kVA (or part) + 15 for each additional kW/kVA
Rebate/DPS.
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
7 LTISLT industrial (S) supply < 22 kVAVerified
| Units | Rate |
|---|---|
| All units | ₹6.20 /kWh |
Fixed charge: ₹80 Monthly minimum fixed charge 80 for the first kW/kVA (or part) + 35 for each additional kW/kVA
10 paise/unit rebate if load factor > 30% and paid by due date (iv). Prompt-payment rebate 10 paise/kWh
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
8 LTIMLT industrial (M) supply >= 22 kVA < 110 kVAVerified
| Units | Rate |
|---|---|
| All units | ₹6.20 /kWh |
Fixed charge: ₹100 Monthly minimum fixed charge 100 for the first kW/kVA (or part) + 80 for each additional kW/kVA
10 paise/unit load-factor rebate (iv). Rebate/DPS.
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
9 SPPSpecified public purpose (LT)Verified
| Units | Rate |
|---|---|
| All units | ₹6.20 /kWh |
Fixed charge: ₹50 Monthly minimum fixed charge 50 for the first kW/kVA (or part) + 50 for each additional kW/kVA
SC/ST Dept school hostels: extra Rs 2.40/unit rebate (xx). Rebate/DPS.
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
10 PWWPublic water works & sewerage pumping < 110 kVAVerified
| Units | Rate |
|---|---|
| All units | ₹6.20 /kWh |
Fixed charge: ₹50 Monthly minimum fixed charge 50 for the first kW/kVA (or part) + 50 for each additional kW/kVA
Swajala Dhara: extra 10% rebate on timely payment (xxi). Prompt-payment rebate 10 paise/kWh
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
11 PWWPublic water works & sewerage pumping >= 110 kVA (LT)Verified
| Units | Rate |
|---|---|
| All units | ₹6.20 /kWh |
Fixed charge: ₹200 Demand charge 200/kVA per month + customer service charge 30/month
Prompt-payment rebate 10 paise/kWh
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
12 GPGeneral purpose >= 110 kVA (LT)Verified
| Units | Rate |
|---|---|
| All units | ₹6.20 /kWh |
Fixed charge: ₹200 Demand charge 200/kVA per month + customer service charge 30/month
Rebate/DPS.
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
13 LILarge industry >= 110 kVA (LT)Verified
| Units | Rate |
|---|---|
| All units | ₹6.20 /kWh |
Fixed charge: ₹200 Demand charge 200/kVA per month + customer service charge 30/month
Rebate/DPS.
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), p.3. Open the order
EVPublic EV charging (under General Purpose)Verified
Charging of electric vehicle through public charging system/station shall be covered under General Purpose (GP) category and single part tariff of Rs. 5.00 per unit shall be applicable.
| Units | Rate |
|---|---|
| All units | ₹5.00 /kWh |
Fixed charge: single-part tariff
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), note xxxi p.8. Open the order
TEMPTemporary connectionsVerified
Fixed charge: energy charges 10% higher than the regular category
Source: OERC Retail Supply Tariff Notification effective 01-04-2026 (common order dt 24-03-2026, Case Nos. 124-139/2025 for TPCODL, TPNODL, TPWODL, TPSODL), note xvii p.6. Open the order
Odisha bill questions
How much is the electricity bill for 100 units in Odisha?
About ₹420.00 for 100 units in a month, using the current OERC tariff. Sanctioned load 2 kW, urban, single phase. Electricity duty and the monthly fuel surcharge are not included.
What will 200 or 300 units cost in Odisha?
Roughly ₹890.00 for 200 units, and ₹1,460.00 for 300 units. Use the calculator above for your exact units and load.
Are Odisha domestic slabs telescopic?
Yes. Each band of units is charged at its own rate, so only the units above a slab boundary pay the higher rate.
How often are Odisha electricity bills issued?
Homes are billed monthly. Enter the units for one billing period.
Which tariff order are these Odisha rates from?
OERC common Order on ARR, Wheeling & Retail Supply Tariff FY 2026-27, dated 24 March 2026, in force from 1 April 2026. A link to the PDF is in the sources box on this page.
What does this estimate leave out?
Prompt payment earns 10 paise/unit off (20 paise for rural homes with correct meters) and 4% off for digital payment; not deducted here. Electricity duty and meter rent (Rs 40-60/month) not included.
Where is the consumer number on my Odisha electricity bill?
The name differs by discom. TPSODL: Consumer Number (12 digits); TPCODL: CA number; TPNODL: Consumer number; TPWODL: Consumer A/c No (12 digits). The table on this page shows where each discom prints it, when its official pages say so.
Where to find your consumer number
Your bill shows a number that identifies your connection. In Odisha the discoms call it:
| Discom | Name on the bill | Digits | Where to find it | Source |
|---|---|---|---|---|
| TPSODL | Consumer Number | 12 | — | TPSODL Customer Zone: bill payment |
| TPCODL | CA number | — | — | TPCODL energy bill payment page (field label) |
| TPNODL | Consumer number | — | — | TPNODL Customer Zone: bill payment |
| TPWODL | Consumer A/c No. | 12 | In the box at the top right, below the rebate and due dates. It is also under the barcode at the top left. | TPWODL bill (sample bill, May 2026) |
From the discoms’ own websites, bill guides and sample bills, read on 17 October 2026. Where the source is a sample bill, we read only its layout: the label, the place and the number of digits. A dash means the official page we read does not say. Never share your consumer number with an unknown caller or app.